Scenario-based approach for flexible resource loading under uncertainty

被引:31
|
作者
Wullink, G [1 ]
Gademann, AJRM [1 ]
Hans, EW [1 ]
Van Harten, A [1 ]
机构
[1] Univ Twente, Sch Business Publ Adm & Technol, NL-7500 AE Enschede, Netherlands
关键词
D O I
10.1080/002075410001733887
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Order acceptance decisions in manufacture-to-order environments are often made based on incomplete or uncertain information. To quote reliable due dates in order processing, manage resource capacity adequately and take into account uncertainty, the paper presents and analyses models and tools for more robust resource loading. We refer to the problem as flexible resource loading under uncertainty. We propose a scenario-based solution approach that can deal with a wide range of uncertainty types. The approach is based on an MILP to find a plan with minimum expected costs over all relevant scenarios. To solve this MILP, we propose an exact branch-and-price algorithin. Further, we propose a much faster improvement heuristic based on an LP (linear programming) approximation. A disadvantage of the scenario-based MILP, is that a large number of scenarios may make the model intractable. We therefore propose an approximate approach that uses the aforementioned solution techniques and only a sample of all scenarios. Computational experiments show that, especially for instances with sufficient slack, Solutions obtained with deterministic techniques that only use the expected scenario can be significantly improved with respect to their expected costs (i.e. robustness). We also show that for large instances, our heuristics outperform the exact approach given a maximum computation time as a stopping criterion. Moreover, it turns out that using a small sample of selected scenarios generally yields better results than using all scenarios.
引用
收藏
页码:5079 / 5098
页数:20
相关论文
共 50 条
  • [1] A Scenario-Based Approach for Operating Theater Scheduling Under Uncertainty
    Freeman, Nickolas K.
    Melouk, Sharif H.
    Mittenthal, John
    M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2016, 18 (02) : 245 - 261
  • [2] JUST-IN-TIME SCHEDULING UNDER SCENARIO-BASED UNCERTAINTY
    Chung, Dae-Young
    Choi, Byung-Cheon
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2013, 30 (02)
  • [3] Performance-based contract design under cost uncertainty: A scenario-based bilevel programming approach
    Sharifi, Mohammadreza
    Kwon, Roy H.
    ENGINEERING ECONOMIST, 2018, 63 (04): : 291 - 318
  • [4] A scenario-based mathematical approach to a robust project portfolio selection problem under fuzzy uncertainty
    Karimi, Saeed
    Mirzamohammadi, Saeed
    Pishvaee, MirSaman
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2022, 42 (04) : 4191 - 4204
  • [5] Complexity of single machine scheduling problems under scenario-based uncertainty
    Aloulou, Mohamed Ali
    Della Croce, Federico
    OPERATIONS RESEARCH LETTERS, 2008, 36 (03) : 338 - 342
  • [6] A scenario-based MCDA framework for wastewater infrastructure planning under uncertainty
    Zheng, Jun
    Egger, Christoph
    Lienert, Judit
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2016, 183 : 895 - 908
  • [7] Scenario-Based Optimization of Supply Chain Performance under Demand Uncertainty
    Gobachew, Asrat Mekonnen
    Haasis, Hans-Dietrich
    SUSTAINABILITY, 2023, 15 (13)
  • [8] A Scenario-Based Chance-Constrained Program for GasolineBlending under Uncertainty
    Wang, Cong
    Zhong, Weimin
    He, Renchu
    Peng, Xin
    Zhao, Liang
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2022, 61 (15) : 5215 - 5226
  • [9] Facility layout problem with QAP formulation under scenario-based uncertainty
    Sahinkoc, Mert
    Bilge, Umit
    INFOR, 2018, 56 (04) : 406 - 427
  • [10] Scenario-based Solution Approach for Uncertain Resource Constrained Scheduling Problems
    Zaman, Forhad
    Elsayed, Saber
    Sarker, Ruhul
    Essam, Daryl
    2018 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2018, : 1331 - 1338