共 50 条
- [41] Simulation of dust lifting process induced by gas explosion disaster in underground coal mine DISASTER ADVANCES, 2012, 5 (04): : 1407 - 1413
- [42] Design of Underground Coal Mine Refuge Chamber PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 1608 - 1611
- [43] A MODEL FOR UNDERGROUND COAL-MINE DESIGN PROCEEDINGS : 1989 MULTINATIONAL CONFERENCE ON MINE PLANNING AND DESIGN, 1989, : 59 - 69
- [45] Driverless technology of underground locomotive in coal mine Meitan Xuebao/Journal of the China Coal Society, 2020, 45 (06): : 2104 - 2115
- [46] PNEUMATIC TRANSPORTATION OF MINE RUN COAL UNDERGROUND MINING CONGRESS JOURNAL, 1971, 57 (12): : 42 - +
- [47] An expert system for underground coal mine planning GOSPODARKA SUROWCAMI MINERALNYMI-MINERAL RESOURCES MANAGEMENT, 2017, 33 (02): : 113 - 127
- [49] Hard rock blasting in an underground coal mine PROCEEDINGS OF THE TWENTY-FIFTH ANNUAL CONFERENCE ON EXPLOSIVES AND BLASTING TECHNIQUE, VOL I, 1999, : 323 - 332
- [50] Underground Coal Mine Communications and Tracking Status CONFERENCE RECORD OF THE 2007 IEEE INDUSTRY APPLICATIONS CONFERENCE FORTY-SECOND IAS ANNUAL MEETING, VOLS. 1-5, 2007, : 2086 - 2089