共 50 条
- [41] Optimal online channel configuration for a Manufacturer under price and lead time-sensitive demand [J]. Journal of Revenue and Pricing Management, 2024, 23 : 121 - 139
- [44] Supply Chain Coordination Mechanism based on Lead-Time Compression under Elastic Demand [J]. ADVANCED MANUFACTURING TECHNOLOGY, PTS 1-4, 2012, 472-475 : 3312 - 3315
- [46] Stackelberg game model of a supply chain under lead-time-dependent demand uncertainty [J]. CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 4489 - 4493
- [47] The single-manufacturer single-retailer integrated production-delivery lot sizing model with production capacity under stochastic lead time demand [J]. 11TH CIRP CONFERENCE ON INDUSTRIAL PRODUCT-SERVICE SYSTEMS, 2019, 83 : 528 - 533
- [49] Modelling supply chain inventory system with controllable lead time under price-dependent demand [J]. The International Journal of Advanced Manufacturing Technology, 2016, 84 : 1861 - 1871
- [50] Modelling supply chain inventory system with controllable lead time under price-dependent demand [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 84 (9-12): : 1861 - 1871