A two-stage heuristic for the sequence-dependent job sequencing and tool switching problem

被引:8
|
作者
Rifai, Achmad Pratama [1 ]
Mara, Setyo Tri Windras [1 ]
Norcahyo, Rachmadi [1 ]
机构
[1] Univ Gadjah Mada, Fac Engn, Dept Mech & Ind Engn, Yogyakarta, Indonesia
关键词
Flexible manufacturing machine; Job sequencing and tool switching; Sequence-dependent setup time; Adaptive large neighborhood search; Simulated annealing; LARGE NEIGHBORHOOD SEARCH; ITERATED LOCAL SEARCH; HYBRID METHOD; MACHINE; OPTIMIZATION; MINIMIZATION; ALGORITHMS; SETUP; MODELS; NUMBER;
D O I
10.1016/j.cie.2021.107813
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The job sequencing and tool switching problem is a combinatorial optimization problem that commonly happens in a flexible manufacturing system environment. In this type of environment, a set of flexible manufacturing machines can be configured with various tools to process different jobs and the requirement to switch tools may correspond to a reduction of productivity. Consequently, research on the job sequencing and tool switching problem has been concentrated on minimizing the number of tools switches. This paper discusses the sequencedependent job sequencing and tool switching problem. The sequence-dependent job sequencing and tool switching problem extends the standard model by considering non-uniform setup times since industrial applications indicate that a tool setup time might be influenced by the previously installed tool at the same magazine slot. A two-stage heuristic procedure is developed here. In the first stage, an adaptive large neighborhood search is deployed for finding the near-optimal job sequence. Then, in the second stage, a combination of the Keep Tool Needed Soonest policy and simulated annealing is proposed for the tooling sub-problem. Comprehensive computational experiments are carried out to demonstrate the efficacy and robustness of the proposed method for solving the sequence-dependent job sequencing and tool switching problem.
引用
下载
收藏
页数:18
相关论文
共 50 条
  • [1] Multiobjective Sequence-Dependent Job Sequencing and Tool Switching Problem
    Rifai, Achmad Pratama
    Sutoyo, Edi
    Mara, Setyo Tri Windras
    Dawal, Siti Zawiah Md
    IEEE SYSTEMS JOURNAL, 2023, 17 (01): : 1395 - 1406
  • [2] The job sequencing and tool switching problem with sequence-dependent set-up time
    Tri Windras Mara S.
    Sutoyo E.
    Norcahyo R.
    Pratama Rifai A.
    Journal of King Saud University - Engineering Sciences, 2023, 35 (01) : 53 - 61
  • [3] Improved heuristic algorithms for the Job Sequencing and Tool Switching Problem
    Paiva, Gustavo Silva
    Carvalho, Marco Antonio M.
    COMPUTERS & OPERATIONS RESEARCH, 2017, 88 : 208 - 219
  • [4] Efficient Heuristic Algorithm for Scheduling Two-Stage Hybrid Flowshop with Sequence-Dependent Setup Times
    Lee, Geun-Cheol
    Hong, Jung Man
    Choi, Seong-Hoon
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015
  • [5] A two-stage heuristic for single machine capacitated lot-sizing and scheduling with sequence-dependent setup costs
    Shim, Ik-Soo
    Kim, Hyeok-Chol
    Doh, Hyoung-Ho
    Lee, Dong-Ho
    COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (04) : 920 - 929
  • [6] Heuristic Solution Methods for the Selective Disassembly Sequencing Problem under Sequence-Dependent Costs
    Jeunet, Jully
    Della Croce, Federico
    Salassa, Fabio
    IFAC PAPERSONLINE, 2019, 52 (13): : 1908 - 1913
  • [7] Heuristic solution methods for the selective disassembly sequencing problem under sequence-dependent costs
    Jeunet, Jully
    Della Croce, Federico
    Salassa, Fabio
    COMPUTERS & OPERATIONS RESEARCH, 2021, 127
  • [8] A heuristic model for the sequence-dependent lot scheduling problem
    Taylor, GD
    Taha, HA
    Chowning, KM
    PRODUCTION PLANNING & CONTROL, 1997, 8 (03) : 213 - 225
  • [9] Heuristic model for the sequence-dependent lot scheduling problem
    Univ of Arkansas, Fayetteville, United States
    Prod Plann Control, 3 (213-225):
  • [10] A search heuristic for the sequence-dependent economic lot scheduling problem
    Wagner, BJ
    Davis, DJ
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 141 (01) : 133 - 146