共 50 条
- [23] Optimal common due-date with completion time tolerance Computers and Operations Research, 1996, 23 (12): : 1203 - 1210
- [26] Multi-objective scheduling with fuzzy due-date Computers and Industrial Engineering, 1998, 35 (3-4): : 439 - 442
- [29] IMPROVING THE JOB-SHOP WORKLOAD CONTROL THROUGH ORDER ACCEPTANCE AND DUE-DATE NEGOTIATION EUROPEAN SIMULATION AND MODELLING CONFERENCE 2009, 2009, : 141 - 145