Multi-objective scheduling with fuzzy due-date

被引:22
|
作者
Murata, T
Gen, M
Ishibuchi, H
机构
[1] Ashikaga Inst Technol, Dept Ind & Syst Engn, Ashikaga, Tochigi 3268558, Japan
[2] Univ Osaka Prefecture, Dept Ind Engn, Osaka 5998531, Japan
关键词
fuzzy flowshop scheduling problem; fuzzy due-date; multi-objective scheduling problem;
D O I
10.1016/S0360-8352(98)00128-4
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, we examine the characteristic features of multi-objective scheduling problems formulated with the concept of fuzzy due-date. By computer simulations, we show that various scheduling criteria can be expressed by modifying the shape of membership functions of fuzzy due-dates. We also show the difficulty in handling the minimum satisfaction grade as a scheduling criterion. This difficulty is caused by the fact that the minimum satisfaction grade is zero for almost all schedules. This makes many search algorithms inefficient. We suggest an idea to cope with this difficulty. (C) 1998 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:439 / 442
页数:4
相关论文
共 50 条
  • [1] Multi-objective due-date setting in a make-to-order environment
    Sawik, Tadeusz
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (22) : 6205 - 6231
  • [2] Job-Shop Scheduling with Fuzzy Due Date by Multi-Objective Particle Swarm Optimization
    Abdolrazzagh-Nezhad, Majid
    Sarbishegi, Saeed
    [J]. 2019 5TH IRANIAN CONFERENCE ON SIGNAL PROCESSING AND INTELLIGENT SYSTEMS (ICSPIS 2019), 2019,
  • [3] BATCH SCHEDULING PROBLEM WITH DUE-DATE AND FUZZY PRECEDENCE RELATION
    Li, Xuesong
    Ishii, Hiroaki
    Chen, Minghao
    [J]. KYBERNETIKA, 2012, 48 (02) : 346 - 356
  • [4] A FIXED-INTERVAL DUE-DATE SCHEDULING PROBLEM WITH EARLINESS AND DUE-DATE COSTS
    CHHAJED, D
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 84 (02) : 385 - 401
  • [5] A fuzzy dispatching strategy for due-date scheduling of FMSs with information delays
    Rahul Caprihan
    Ashok Kumar
    Kathryn E. Stecke
    [J]. International Journal of Flexible Manufacturing Systems, 2006, 18 : 29 - 53
  • [6] A fuzzy dispatching strategy for due-date scheduling of FMSs with information delays
    Caprihan, Rahul
    Kumar, Ashok
    Stecke, Kathryn E.
    [J]. INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 2006, 18 (01): : 29 - 53
  • [7] A Memetic Algorithm for Due-Date Satisfaction in Fuzzy Job Shop Scheduling
    Jose Palacios, Juan
    Vela, Camino R.
    Gonzalez-Rodriguez, Ines
    Puente, Jorge
    [J]. NATURAL AND ARTIFICIAL COMPUTATION FOR BIOMEDICINE AND NEUROSCIENCE, PT I, 2017, 10337 : 135 - 145
  • [8] Due date optimization in multi-objective scheduling of flexible job shop production
    Ojstersek, R.
    Tang, M.
    Buchmeister, B.
    [J]. ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2020, 15 (04): : 481 - 492
  • [9] EXPERIMENTAL INVESTIGATION OF AN FMS DUE-DATE SCHEDULING PROBLEM - AN EVALUATION OF DUE-DATE ASSIGNMENT RULES
    SABUNCUOGLU, I
    HOMMERTZHEIM, DL
    [J]. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1995, 8 (02) : 133 - 144
  • [10] Multi-Objective Sequencing Optimization for Mixed-Model Assembly Line Considering Due-Date Satisfaction
    Shimizu, Yoshiaki
    Waki, Toshiya
    Sakaguchi, Tatsuhiko
    [J]. JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2012, 6 (07): : 1057 - 1070