The Joint Optimization of Spare Parts and Maintenance Personel Under Lateral Transshipment

被引:0
|
作者
Cui, B. W. [1 ]
Feng, Q. [1 ]
Ren, Y. [1 ]
Sun, B. [1 ]
Qian, C. [1 ]
Yang, D. Z. [1 ]
机构
[1] Beihang Univ, Dept Reliabil & Syst Engn, Beijing, Peoples R China
关键词
Joint optimization; spare parts; maintenance personnel; greedy heuristic; SYSTEMS;
D O I
10.1109/ieem44572.2019.8978686
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper proposes an optimization approach to plan the maintenance personnel and spare parts in a multiple echelon stocking system. In this system, for each failure requested by group p epsilon P-j, if the jth local warehouse has available inventory, maintenance personnel with a spare part will be supplied by it, otherwise, the resources request will be routed to other warehouses. The optimal stock policy (S) which can minimal total cost is the optimized target, including holding cost, ordering cost, maintenance cost and transshipment cost. A heuristic approach is used to obtain S. Using the heuristic methods, a complex system consisted of one plant, two central warehouses and three local warehouses is considered, the system served for three groups with two machines, and five modules is consisted in each equipment. The simulation results show the model's effectiveness.
引用
收藏
页码:965 / 967
页数:3
相关论文
共 50 条
  • [31] Joint optimization of preventive maintenance and inventory management for standby systems with hybrid-deteriorating spare parts
    Zhang, Jian-Xun
    Du, Dang-Bo
    Si, Xiao-Sheng
    Hu, Chang-Hua
    Zhang, Han-Wen
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 214
  • [32] Joint optimization of the selective maintenance and repairperson assignment problem when using new and remanufactured spare parts
    Khatab, A.
    Diallo, C.
    Aghezzaf, E. H.
    Venkatadri, U.
    IFAC PAPERSONLINE, 2019, 52 (13): : 1063 - 1068
  • [33] Joint optimization of condition-based opportunistic maintenance and spare parts provisioning policy in multiunit systems
    Zhang, Xiaohong
    Zeng, Jianchao
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 262 (02) : 479 - 498
  • [34] Joint optimization of Maintenance Force and Spare Parts Provision for k-out-of-n System in Wartime
    Wang, Qiang
    Cheng, Zhonghua
    Ran, Qiaoran
    Wang, Yadong
    PROCEEDINGS OF 2018 IEEE 3RD ADVANCED INFORMATION TECHNOLOGY, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IAEAC 2018), 2018, : 1792 - 1799
  • [35] Allocation model of spare parts for three-echelon inventory system with lateral transshipment based on Markov
    Dong, Qi
    Xu, Ting-Xue
    Cong, Lin-Hu
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2015, 37 (11): : 2524 - 2530
  • [36] Multi-Objective Spare Parts Scheduling Method in Wartime Considering Lateral Transshipment and Emergency Distribution
    Li J.
    Chen Y.
    Xiang H.
    Gao Y.
    Zhao J.
    Binggong Xuebao/Acta Armamentarii, 2023, 44 (03): : 816 - 830
  • [37] A stochastic model for joint spare parts inventory and planned maintenance optimisation
    Wang, Wenbin
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 216 (01) : 127 - 139
  • [38] Joint optimization of level of repair analysis and spare parts stocks
    Basten, R. J. I.
    van der Heijden, M. C.
    Schutten, J. M. J.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 222 (03) : 474 - 483
  • [39] Joint Optimization of Replacement and Spare Parts Ordering with Dual Sourcing
    Ye H.
    Su H.
    Zheng M.
    Xia T.
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2022, 56 (10): : 1359 - 1367
  • [40] JOINT OPTIMIZATION OF STATE MAINTENANCE AND SPARE PARTS INVENTORY OF OFFSHORE WIND TURBINES BASED ON DEEP REINFORCEMENT LEARNING
    Dong W.
    Wu Y.
    Yao Q.
    Guo J.
    Zhao T.
    Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2023, 44 (12): : 190 - 199