A stochastic model for joint spare parts inventory and planned maintenance optimisation

被引:99
|
作者
Wang, Wenbin [1 ]
机构
[1] Univ Sci & Technol Beijing, Dongling Sch Econ & Management, Beijing, Peoples R China
关键词
Spare parts; Inventory; Maintenance; Delay-time; Dynamic programming; Optimisation; DELAY-TIME ANALYSIS; OF-N SYSTEMS; REPAIR CAPACITY; PROVISIONING POLICY; BLOCK-REPLACEMENT; DEMAND; LEVEL;
D O I
10.1016/j.ejor.2011.07.031
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Spare parts demands are usually generated by the need of maintenance either preventively or at failures. These demands are difficult to predict based on historical data of past spare parts usages, and therefore, the optimal inventory control policy may be also difficult to obtain. However, it is well known that maintenance costs are related to the availability of spare parts and the penalty cost of unavailable spare parts consists of usually the cost of, for example, extended downtime for waiting the spare parts and the emergency expedition cost for acquiring the spare parts. On the other hand, proper planned maintenance intervention can reduce the number of failures and associated costs but its performance also depends on the availability of spare parts. This paper presents the joint optimisation for both the inventory control of the spare parts and the Preventive Maintenance (PM) inspection interval. The decision variables are the order interval, PM interval and order quantity. Because of the random nature of plant failures, stochastic cost models for spare parts inventory and maintenance are derived and an enumeration algorithm with stochastic dynamic programming is employed for finding the joint optimal solutions over a finite time horizon. The delay-time concept developed for inspection modelling is used to construct the probabilities of the number of failures and the number of the defective items identified at a PM epoch, which has not been used in this type of problems before. The inventory model follows a periodic review policy but with the demand governed by the need for spare parts due to maintenance. We demonstrate the developed model using a numerical example. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:127 / 139
页数:13
相关论文
共 50 条
  • [1] COST OPTIMISATION OF SPARE PARTS INVENTORY IN TECHNICAL SYSTEMS MAINTENANCE PROCESSES
    Bojanic, Branislav
    Miletic, Boris
    Kondic, Zivko
    ECONOMIC AND SOCIAL DEVELOPMENT (ESD), 2016, : 224 - 233
  • [2] A stochastic programming model for jointly optimizing maintenance and spare parts inventory for IoT applications
    Shi, Jiachen
    Rozas, Heraldo
    Yildirim, Murat
    Gebraeel, Nagi
    IISE TRANSACTIONS, 2023, 55 (04) : 419 - 431
  • [3] On the joint optimization of the periodic preventive maintenance and the spare parts inventory problem
    Mjirda, Anis
    Benmansour, Rachid
    Allaoui, Hamid
    Goncalves, Gilles
    IFAC PAPERSONLINE, 2016, 49 (12): : 881 - 885
  • [4] Joint Optimization of Preventive Maintenance and Spare Parts Inventory with Appointment Policy
    Cai, Jing
    Yin, Yibing
    Zhang, Li
    Chen, Xi
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2017, 2017
  • [5] PLANNED MAINTENANCE AND SPARE PARTS CONTROL .3. SPARE PARTS CONTROL
    BRONNER, A
    BRAUWISSENSCHAFT, 1980, 33 (09): : 238 - 243
  • [6] A two-stage Genetic Algorithm for joint coordination of spare parts inventory and planned maintenance under uncertain failures
    Yu, Vincent F.
    Salsabila, Nabila Yuraisyah
    Siswanto, Nurhadi
    Kuo, Po-Hsun
    APPLIED SOFT COMPUTING, 2022, 130
  • [7] Joint optimisation of inspection maintenance and spare parts provisioning: a comparative study of inventory policies using simulation and survey data
    Zahedi-Hosseini, Farhad
    Scarf, Philip
    Syntetos, Aris
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2017, 168 : 306 - 316
  • [8] Stochastic and Deterministic Petri Networks Model for Joint Management Model for Spare Parts and Maintenance: Simulation Study
    Bounou, Oumaima
    El Barkany, Abdellah
    El Biyaali, Ahmed
    INTERNATIONAL JOURNAL OF ENGINEERING RESEARCH IN AFRICA, 2020, 46 : 180 - 188
  • [9] Building inventory management system by using stochastic inventory model for critical spare parts used for maintenance of construction machines
    Kasap, Nihat
    Bicer, Ilker
    Ozkaya, Banu Yuksel
    ISTANBUL UNIVERSITY JOURNAL OF THE SCHOOL OF BUSINESS, 2010, 39 (02): : 310 - 334
  • [10] INITIAL PROVISIONING AND SPARE PARTS INVENTORY NETWORK OPTIMISATION IN A MULTI MAINTENANCE BASE ENVIRONMENT
    Lendermann, Peter
    Thirunavukkarasu, Annamalai
    Low, Malcolm Yoke Hean
    McGinnis, Leon F.
    2012 WINTER SIMULATION CONFERENCE (WSC), 2012,