共 50 条
- [31] The Design and Application of Deformation Automatic Monitoring System for Metro Tunnel Crossing Project 2020 CHINESE AUTOMATION CONGRESS (CAC 2020), 2020, : 678 - 682
- [32] CORRELATION AMONG THE SOIL PARAMETERS OF THE KARNAPHULI RIVER TUNNEL PROJECT INTERNATIONAL JOURNAL OF GEOMATE, 2018, 15 (48): : 86 - 90
- [33] Risk Analysis during Departure and Reception of Shield in the Yellow River Crossing Tunnel of the Middle Route Project of South-to-North Water Diversion ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 2125 - 2130
- [34] FISHES OF THE ALLEGHENY RIVER ABOVE KINZUA DAM NEW YORK FISH AND GAME JOURNAL, 1982, 29 (02): : 189 - 198
- [35] AM/FM project implementation at Allegheny Power CONFERENCE XXI - AM/FM INTERNATIONAL, PROCEEDINGS, 1998, : 587 - 593
- [36] Prediction of the Maximum Riverbed Erosion Depth nearby the River-Crossing Tunnel in Nanchang Reach of Ganjiang River ADVANCES IN HYDROLOGY AND HYDRAULIC ENGINEERING, PTS 1 AND 2, 2012, 212-213 : 130 - +