Risk Analysis during Departure and Reception of Shield in the Yellow River Crossing Tunnel of the Middle Route Project of South-to-North Water Diversion

被引:2
|
作者
Dun Zhilin [1 ]
Cao Yang [1 ]
Ren Lianwei [1 ]
机构
[1] Henan Polytech Univ, Sch Civil Engn, Jiaozuo 454000, Henan, Peoples R China
来源
关键词
the Yellow River crossing tunnel of South-to-North water diversion project; risk analysis; fault tree; fuzzy comprehensive evaluation;
D O I
10.4028/www.scientific.net/AMM.90-93.2125
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the Yellow River crossing tunnel of the middle route project of South-to-North water diversion, its geological conditions are very complicated, so potential risks are much likely to occur in the construction. Based on the fault tree analysis, fuzzy comprehensive evaluation method is also used for the quantitative analysis on the risks during the departure and reception phase of the tunnel construction. And it turns out that, there are risks of collapse of working well, leakage and plasma leakage, mechanical equipment failure and large deviation from the designed axis during the construction. Finally, the measures available of risk aversion are put forward, which have achieved good field applications and also provided some reference value for similar projects in the future construction.
引用
下载
收藏
页码:2125 / 2130
页数:6
相关论文
共 50 条
  • [1] Risk analysis and control in the Yellow River-crossing tunnel of South-to-North Water Diversion East Line
    Liu Bo
    Wang You-zhi
    Niu Meng-ting
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2655 - 2658
  • [2] Water pressure test in the design of the tunnel in Yellow River crossing project of the mid-route of South-to-north water transfer project
    Yang, J.
    Wang, J.
    Wang, R. H.
    Cheng, L.
    Li, F. X.
    WATER RESOURCES AND ENVIRONMENT, 2016, : 59 - 65
  • [3] Integrated risk evaluation of large river-crossing buildings in the Middle of the South-to-North Water Diversion Project
    Han X.
    An X.
    Liu C.
    Qinghua Daxue Xuebao/Journal of Tsinghua University, 2018, 58 (07): : 639 - 649
  • [4] Scheme selection of crossing on Yellow River in first-stage of Middle Route South-to-North Water Transfer Project
    Ministry of Water Resources, Beijing 100053, China
    Shuili Xuebao, 2006, 1 (1-9):
  • [5] The Application of Compaction Sand Pile in the Yellow River-Crossing Project for South-to-North Water Diversion
    Liu, Qi-xia
    Bai, Yang
    VIBRATION, STRUCTURAL ENGINEERING AND MEASUREMENT II, PTS 1-3, 2012, 226-228 : 1396 - +
  • [6] Comprehensive risk assessment of algae and shellfish in the middle route of South-to-North Water Diversion Project
    Yan Long
    Mengjuan Feng
    Youming Li
    Jia Qu
    Wei Gao
    Environmental Science and Pollution Research, 2022, 29 : 79320 - 79330
  • [7] Comprehensive risk assessment of algae and shellfish in the middle route of South-to-North Water Diversion Project
    Long, Yan
    Feng, Mengjuan
    Li, Youming
    Qu, Jia
    Gao, Wei
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2022, 29 (52) : 79320 - 79330
  • [8] Ice Processes Simulation for Middle Route of South-to-North Water Diversion Project
    Fu, Hui
    Yang, Kailin
    Guo, Xinlei
    Wang, Tao
    Guo, Yongxin
    PROCEEDINGS OF THE 35TH IAHR WORLD CONGRESS, VOLS III AND IV, 2013,
  • [9] Water quality variation in the middle route of South-to-North Water Diversion Project, China
    Wang, Yuanzhu
    Wang, Chenglin
    Zhang, Chunmei
    Liang, Jiangkui
    Mi, Wujuan
    Song, Gaofei
    Zhu, Yuxuan
    Wang, Shulei
    Shang, Yuming
    Bi, Yonghong
    FRONTIERS IN ENVIRONMENTAL SCIENCE, 2023, 11
  • [10] Evolutionary Game Analysis of Emergency Management of the Middle Route of South-to-North Water Diversion Project
    Li Hongyan
    Water Resources Management, 2017, 31 : 2777 - 2789