共 50 条
- [1] Risk analysis and control in the Yellow River-crossing tunnel of South-to-North Water Diversion East Line ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2655 - 2658
- [2] Water pressure test in the design of the tunnel in Yellow River crossing project of the mid-route of South-to-north water transfer project WATER RESOURCES AND ENVIRONMENT, 2016, : 59 - 65
- [3] Integrated risk evaluation of large river-crossing buildings in the Middle of the South-to-North Water Diversion Project Qinghua Daxue Xuebao/Journal of Tsinghua University, 2018, 58 (07): : 639 - 649
- [4] Scheme selection of crossing on Yellow River in first-stage of Middle Route South-to-North Water Transfer Project Shuili Xuebao, 2006, 1 (1-9):
- [5] The Application of Compaction Sand Pile in the Yellow River-Crossing Project for South-to-North Water Diversion VIBRATION, STRUCTURAL ENGINEERING AND MEASUREMENT II, PTS 1-3, 2012, 226-228 : 1396 - +
- [6] Comprehensive risk assessment of algae and shellfish in the middle route of South-to-North Water Diversion Project Environmental Science and Pollution Research, 2022, 29 : 79320 - 79330
- [8] Ice Processes Simulation for Middle Route of South-to-North Water Diversion Project PROCEEDINGS OF THE 35TH IAHR WORLD CONGRESS, VOLS III AND IV, 2013,
- [10] Evolutionary Game Analysis of Emergency Management of the Middle Route of South-to-North Water Diversion Project Water Resources Management, 2017, 31 : 2777 - 2789