共 50 条
- [41] Numerical research on reasonable width of coal pillar in the double gob-side entries Si, X.-Y. (qymkswgt@163.com), 1600, China University of Mining and Technology (29): : 215 - 219
- [43] Optimization of the fully-mechanized stoping face length and efficiency in a coal mine Journal of Mining Science, 2013, 49 : 254 - 264
- [44] Analyzing on air-leakage condition of gate in fully-mechanized long-wall top-coal caving mining face Meitan Xuebao/Journal of China Coal Society, 2000, 25 (06): : 619 - 623
- [45] Application of Loose Blasting in Fully-Mechanized Coal Face Crossing Faults CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 1880 - 1883
- [46] The rational width of the support body of gob-side entry in fully mechanized backfill mining Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2013, 30 (02): : 159 - 164
- [48] Strata behavior at fully-mechanized coal mining and solid backfilling face SPRINGERPLUS, 2016, 5
- [50] MINING A FULLY-MECHANIZED COAL FACE WITH 180 degree TURNING. Coal Science and Technology (Peking), 1984, (04): : 2 - 6