Microcirculation of air leakage of gob-side coal pillar in fully-mechanized face

被引:0
|
作者
Zhu, H. Q. [1 ]
Zhu, S. H. [1 ]
Feng, S. L. [1 ]
Jia, G. W. [1 ]
机构
[1] China Univ Min & Technol Beijing, Beijing, Peoples R China
关键词
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Microcirculation of air leakage among the gob behind the working face, the gob-side coal pillar and the adjacent gob is investigated theoretically by nonlinear seepage equation. The 2D model is built containing two gobs with heterogeneous porosity distribution and one gob-side coal pillar. Velocity field and streamline distribution of the microcirculation are simulated by the commercial code Fluent. Causes of the microcirculation are also discussed. The results show that fresh air flows into the gob behind the working face, and penetrates into the adjacent gob through the gob-side coal pillar. Microcirculation of air leakage increases air volume that flows into the gob and promotes the spontaneous combustion of residual coal. Gob breathe is also initiated by the oxidation process in which the consumption and supplement of oxygen alternates and thus results in the fluctuation of concentration of CO and O-2.
引用
收藏
页码:1023 / 1027
页数:5
相关论文
共 50 条
  • [31] Research on Coal Pillar Width and Support Design of Gob-Side Entry
    Yong Yang
    Jian Sun
    Wei Wang
    Ruofei Zhang
    Geotechnical and Geological Engineering, 2023, 41 : 847 - 860
  • [32] Surrounding rock movement mechanism and cable reinforcement support technology for gob-side entry retaining in the dynamic pressure area of deep fully-mechanized mining face
    Wang, Fangtian
    Jiang, Zhenpeng
    Liu, Chao
    He, Dongsheng
    Hao, Wenhua
    Qu, Hongfei
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2024, 41 (06): : 1103 - 1115
  • [33] Failure mechanism and cable truss control of large-scale section gob-side entry roof with fully-mechanized caving
    Wei, Zhen
    He, Fulian
    Zhang, Guangchao
    Gao, Yuan
    Lai, Yonghui
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2017, 34 (01): : 1 - 8
  • [34] Width determination of protection coal pillar of gob-side entry driving in coal mine
    School of Safety Engineering, Henan University of Engineering, Zhengzhou, Henan
    451191, China
    不详
    100083, China
    Electron. J. Geotech. Eng., 23 (7481-7490):
  • [35] Reasonable Width of Segment Pillar of Fully-Mechanized Caving Face in Inclined Extra-Thick Coal Seam
    Fan N.
    Wang J.
    Zhang B.
    Liu D.
    Wang R.
    Geotechnical and Geological Engineering, 2020, 38 (04) : 4189 - 4200
  • [36] Technology and equipment for pillar-wall fully-mechanized coal mining in india
    China Coal Overseas Development Co. Ltd, Beijing 100011, China
    Caikuang yu Anquan Gongcheng Xuebao, 2009, 2 (229-233):
  • [37] Stability analysis of section coal pillar at a fully-mechanized working face based on axial bolt load tests
    Zhang H.-Q.
    Shi H.
    Li M.
    Wu Y.
    Chen Y.-L.
    Zhang G.-M.
    1600, China Coal Society (42): : 429 - 435
  • [38] Failure laws of narrow pillar and asymmetric control technique of gob-side entry driving in island coal face
    Yang Jiping
    Cao Shenggen
    Li Xuehua
    InternationalJournalofMiningScienceandTechnology, 2013, 23 (02) : 271 - 276
  • [39] Supporting of gob-side entries driving head-on adjacent advancing coal face with a reserved narrow pillar
    Zhang, N
    Li, XH
    Zhou, JY
    Mining Science and Technology, 2004, : 441 - 444
  • [40] Failure laws of narrow pillar and asymmetric control technique of gob-side entry driving in island coal face
    Yang Jiping
    Cao Shenggen
    Li Xuehua
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2013, 23 (02) : 267 - 272