Study on three-layer unsteady model of cuttings transport for extended-reach well

被引:48
|
作者
Guo, Xiao-le [1 ,2 ]
Wang, Zhi-ming [2 ]
Long, Zhi-hui [1 ]
机构
[1] Chongqing Univ Sci & Technol, Coll Oil & Gas Engn, Chongqing 401331, Peoples R China
[2] China Univ Petr, Coll Oil & Gas Engn, Beijing 102249, Peoples R China
关键词
ERW; cuttings transport; unsteady model; SETS method; HORIZONTAL PIPES; FLOW;
D O I
10.1016/j.petrol.2010.05.020
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Hole cleaning is one of the key technologies in extended-reach drilling, the core of which is cuttings transport research. Based on the three-layer steady cuttings transport model of inclined section and two-layer unsteady model developed, a three-layer unsteady cuttings transport model for all sections of ERW is developed and the mechanisms of suspension, rolling and sliding of cuttings, the relative velocity between solid and liquid in suspension layer and the effect of drillpipe rotation are all taken into account. The SETS method is used to solve the model in numerical solution. And the process of solution is described in details. The problem caused by the assumption of fixed bit location, which is inconsistent with the actual drilling, is solved by simulation of dynamic well bottom using virtual grid. The model can be used for calculation and simulation of all sections and processes in actual drilling and well flushing conditions. (C) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:171 / 180
页数:10
相关论文
共 50 条
  • [21] Sakhalin-1 extended-reach well eclipses 15000 m
    2018, Society of Petroleum Engineers (SPE) (70):
  • [22] ExxonMobil drills record extended-reach well at Sakhalin-1
    Watkins, Eric
    OIL & GAS JOURNAL, 2008, 106 (07) : 33 - 34
  • [23] A Study on the Stability of the Borehole in Shale, in Extended-reach Drilling
    Yu, Baohua
    Yan, Chuanliang
    Gao, Deli
    Li, Jinxiang
    CMES-COMPUTER MODELING IN ENGINEERING & SCIENCES, 2012, 89 (01): : 57 - 78
  • [24] Extended-reach stimulation with coiled tubing: A case study
    Patrick, K
    Hornett, M
    Foose, J
    JOURNAL OF PETROLEUM TECHNOLOGY, 2003, 55 (11): : 45 - 46
  • [25] A study on the stability of the borehole in shale, in extended-reach drilling
    Yu, Baohua
    Yan, Chuanliang
    Gao, Deli
    Li, Jinxiang
    CMES - Computer Modeling in Engineering and Sciences, 2013, 89 (01): : 57 - 78
  • [26] Hole cleaning evaluation and installation spacing optimization of cuttings bed remover in extended-reach drilling
    Shuo Peng
    WenJun Huang
    DeLi Gao
    Petroleum Science, 2024, (03) : 2005 - 2022
  • [27] Hole cleaning evaluation and installation spacing optimization of cuttings bed remover in extended-reach drilling
    Shuo Peng
    WenJun Huang
    DeLi Gao
    Petroleum Science, 2024, 21 (03) : 2005 - 2022
  • [28] Extended-Reach Stimulation With Coiled Tubing: A Case Study
    1600, Society of Petroleum Engineers (SPE) (55):
  • [29] Hole cleaning evaluation and installation spacing optimization of cuttings bed remover in extended-reach drilling
    Peng, Shuo
    Huang, Wen-Jun
    Gao, De-Li
    PETROLEUM SCIENCE, 2024, 21 (03) : 2005 - 2022
  • [30] Numerical study of the process of unsteady flow in a three-layer porous medium
    Ravshanov, R.
    Abdullaev, Z. S.
    Kotov, E. V.
    Turkmanova, Sh. N.
    MAGAZINE OF CIVIL ENGINEERING, 2023, 119 (03):