Performance evaluation of hydro power reservoir

被引:0
|
作者
Kalkani, EC [1 ]
机构
[1] Natl Tech Univ Athens, Fac Civil Engn, GR-10682 Athens, Greece
来源
关键词
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The rule curves developed for a specific reservoir are used to evaluate the performance of the reservoir within a year and compare to the forecast performance by using inflow and benefit summation curves. The range of annual benefit from lower values in dry years and higher values in wet years is obtained under certain risk conditions. The 32-year period of reservoir routing indicates that the boundaries of annual benefit may be higher or lower expressed as positive or negative quantities added to the annual benefit. It is proven that the realised reservoir level variation followed the forecast one from August to November, and from April to July. Due to several reasons the reservoir was lowered from December to March, indicating an extremely intense lowering. Higher rates of power production are also present at the end of September - beginning of October, the first fortnight: of December and in middle Match. In the months of middle October to end of November due to testing of the turbines and in April due to the plant maintenance no power was produced. Although the variation of the power factor is not considerably great, it is easily understood that operation of the reservoir at lower levels than those suggested by the lower boundary of the rule curves, results in energy loss which may be in considerable amounts.
引用
收藏
页码:405 / 412
页数:8
相关论文
共 50 条
  • [41] Performance Testing of Low Head Small Hydro Power Development in Thailand
    Phitaksurachai, Suwat
    Pan-Aram, Rudklao
    Sritrakul, Noppong
    Tiaple, Yodchai
    2017 INTERNATIONAL CONFERENCE ON ALTERNATIVE ENERGY IN DEVELOPING COUNTRIES AND EMERGING ECONOMIES, 2017, 138 : 1140 - 1146
  • [42] Unregulated performance of an induction generator in an isolated micro hydro power plant
    Rajakaruna, Sumedha
    Maw, Naing Naing
    IPEC: 2005 INTERNATIONAL POWER ENGINEERING CONFERENCE, VOLS 1 AND 2, 2005, : 533 - 538
  • [43] Multiscale power fluctuation evaluation of a hydro-wind-photovoltaic system
    Xiong, Hualin
    Xu, Beibei
    Kheav, Kimleng
    Luo, Xingqi
    Zhang, Xingjin
    Patelli, Edoardo
    Guo, Pengcheng
    Chen, Diyi
    RENEWABLE ENERGY, 2021, 175 : 153 - 166
  • [44] Performance of a Hydro Power Plant During Black Start and Islanded Operation
    Kurup, Sreeram R.
    Ashok, S.
    2015 IEEE INTERNATIONAL CONFERENCE ON SIGNAL PROCESSING, INFORMATICS, COMMUNICATION AND ENERGY SYSTEMS (SPICES), 2015,
  • [45] Electricity Production in a Hydro System with a Reservoir Constraint*
    Mathiesen, Lars
    Skaar, Jostein
    Sorgard, Lars
    SCANDINAVIAN JOURNAL OF ECONOMICS, 2013, 115 (02): : 575 - 594
  • [46] Determination of installation capacity in reservoir hydro-power plants considering technical, economical and reliability indices
    Hosseini, S. M. H.
    Forouzbakhsh, F.
    Fotouhi, M.
    Vakilian, M.
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2008, 30 (6-7) : 393 - 402
  • [47] Evaluation of fractal models to describe reservoir heterogeneity and performance
    Perez, G
    Chopra, AK
    SPE FORMATION EVALUATION, 1997, 12 (01): : 65 - 72
  • [48] Waterflood performance evaluation in a chalk reservoir with an ensemble of tools
    Olsen, C.
    Kabir, C. S.
    JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2014, 124 : 60 - 71
  • [49] Performance evaluation of horizontal wells in a tight carbonate reservoir
    Kabir, C.S.
    Del Signore, A.G.
    Al-Fares, A.A.
    Proceedings - SPE Annual Technical Conference and Exhibition, 1997, Sigma : 643 - 654
  • [50] Evaluation of frontal models to describe reservoir heterogeneity and performance
    Perez, G.
    Chopra, A.K.
    Proceedings - SPE Annual Technical Conference and Exhibition, 1991, Sigma : 25 - 36