Performance evaluation of hydro power reservoir

被引:0
|
作者
Kalkani, EC [1 ]
机构
[1] Natl Tech Univ Athens, Fac Civil Engn, GR-10682 Athens, Greece
来源
关键词
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The rule curves developed for a specific reservoir are used to evaluate the performance of the reservoir within a year and compare to the forecast performance by using inflow and benefit summation curves. The range of annual benefit from lower values in dry years and higher values in wet years is obtained under certain risk conditions. The 32-year period of reservoir routing indicates that the boundaries of annual benefit may be higher or lower expressed as positive or negative quantities added to the annual benefit. It is proven that the realised reservoir level variation followed the forecast one from August to November, and from April to July. Due to several reasons the reservoir was lowered from December to March, indicating an extremely intense lowering. Higher rates of power production are also present at the end of September - beginning of October, the first fortnight: of December and in middle Match. In the months of middle October to end of November due to testing of the turbines and in April due to the plant maintenance no power was produced. Although the variation of the power factor is not considerably great, it is easily understood that operation of the reservoir at lower levels than those suggested by the lower boundary of the rule curves, results in energy loss which may be in considerable amounts.
引用
收藏
页码:405 / 412
页数:8
相关论文
共 50 条
  • [22] Gross greenhouse gas fluxes from hydro-power reservoir compared to thermo-power plants
    dos Santos, MA
    Rosa, LP
    Sikar, B
    Sikar, E
    dos Santos, EO
    ENERGY POLICY, 2006, 34 (04) : 481 - 488
  • [23] HYDRO POWER
    Lerner, Jonathan
    LANDSCAPE ARCHITECTURE MAGAZINE, 2018, 108 (10) : 140 - 157
  • [24] Reservoir sedimentation at Chinese hydro schemes
    Xuemin, Cheng
    International Water Power and Dam Construction, 1992, 44 (10): : 44 - 47
  • [25] Transmission Limits Evaluation in Hydro-Dominated Power Systems
    Assis, T. M. L.
    Taranto, G. N.
    Falcao, D. M.
    Sant'Anna, E. G. S.
    2011 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2011,
  • [26] HYDRO POWER
    King, Anthony
    CHEMISTRY & INDUSTRY, 2015, 79 (06) : 42 - 45
  • [27] CONTRAST OF POWER SYSTEM STABILIZER PERFORMANCE ON HYDRO AND THERMAL UNITS
    MOBARAK, M
    THORNE, D
    HILL, E
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1980, 99 (04): : 1522 - 1533
  • [28] Performance of a direct drive hydro turbine for wave power generation
    Lee, Y-H
    Kim, C-G
    Choi, Y-D
    Kim, I-S
    Hwang, Y-C
    25TH IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND SYSTEMS, 2010, 12
  • [29] EVALUATION OF HYDRO POWER PLANTS AVAILABILITY BY MONTE CARLO SIMULATION
    Hora, Cristina
    Bendea, Gabriel
    Secui, Dinu
    Dzitac, Simona
    ANNALS OF DAAAM FOR 2009 & PROCEEDINGS OF THE 20TH INTERNATIONAL DAAAM SYMPOSIUM, 2009, 20 : 59 - 60
  • [30] Periodic stochastic models for reservoir performance evaluation
    Srinivasan, K.
    Achyutha, H.
    Seetharamu, K.N.
    Venkatarangan, S.N.
    Sriram, L.
    Journal of the Institution of Engineers (India): Civil Engineering Division, 1995, 76 : 115 - 122