A PRACTICAL ALGORITHMIC APPROACH TOWARDS MULTI-MODAL RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEMS (MMRCMPSP)

被引:0
|
作者
Voelker, Michael [1 ]
Zahid, Taiba [1 ]
Schmidt, Thorsten [1 ]
机构
[1] Tech Univ Dresden, Fak Maschinenwesen, D-01062 Dresden, Germany
关键词
Operations management; constrained scheduling; multi-modes; heuristics; SEARCH ALGORITHM;
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The literature concerning resource constrained project scheduling problems (RCPSP) are mainly based on series or parallel schedule generation schemes with priority sequencing rules to resolve conflicts. Recently, these models have been extended for scheduling multi-modal RCPSP (MMRCPSP) where each activity has multiple possibilities to be performed thus providing decision managers a useful tool for manipulating resources and activities. Nonetheless, this further complicates the scheduling problem inflicted by increase of decision variables. Multiple heuristics have been proposed for this NP-hard problem. The main solution strategy adopted by such heuristics is a two loops decision strategy. Basically the problem is split between two parts where first part is conversion of MMRCPSP to RCPSP (mode fix) while second is finding feasible solution for a resource constrained project and is restricted to single project environments. This research aims on the development of scheduling heuristics, exploring the possibilities of scheduling MMRCPSP with parallel assignment of modes while sequencing the activities. The work addresses Multi-Mode Resource Constrained Multi-Project Scheduling Problem, (MMRCMPSP) by formulating a mathematical model that regards practical requirements of working systems. The algorithm is made intelligent and flexible in order to adopt and shift among various defined heuristic rules under different objectives to function as a decision support tool for managers.
引用
下载
收藏
页数:10
相关论文
共 50 条
  • [1] Taking advantage of solving the resource constrained multi-project scheduling problems using multi-modal genetic algorithms
    Perez, E.
    Posada, M.
    Lorenzana, A.
    SOFT COMPUTING, 2016, 20 (05) : 1879 - 1896
  • [2] Taking advantage of solving the resource constrained multi-project scheduling problems using multi-modal genetic algorithms
    E. Pérez
    M. Posada
    A. Lorenzana
    Soft Computing, 2016, 20 : 1879 - 1896
  • [3] A survey in the resource-constrained project and multi-project scheduling problems
    Ben Issa, Samer
    Tu, Yiliu
    JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 117 - 138
  • [4] Investigation of genetic operators and priority heuristics for simulation based optimization of Multi-Mode Resource Constrained Multi-Project Scheduling Problems (MMRCMPSP)
    Kuehn, Mathias
    Zahid, Taiba
    Voelker, Michael
    Zhou, Zhugen
    Rose, Oliver
    PROCEEDINGS - 30TH EUROPEAN CONFERENCE ON MODELLING AND SIMULATION ECMS 2016, 2016, : 481 - 487
  • [5] Applying Genetic Algorithm to Resource Constrained Multi-Project Scheduling Problems
    Chen, James C.
    Jaong, Wun-Hao
    Sun, Cheng-Ju
    Lee, Hung-Yu
    Wu, Jenn-Sheng
    Ku, Chung-Chao
    ADVANCED DESIGN AND MANUFACTURE II, 2010, 419-420 : 633 - +
  • [6] Multi-mode resource constrained multi-project scheduling and resource portfolio problem
    Besikci, Umut
    Bilge, Umit
    Ulusoy, Gunduz
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (01) : 22 - 31
  • [7] Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times
    Suresh, M.
    Dutta, Pankaj
    Jain, Karuna
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2015, 32 (06)
  • [8] Applying hybrid genetic algorithm to multi-mode resource constrained multi-project scheduling problems
    Chen, James C.
    Lee, Hung-Yu
    Hsieh, Wen-Haiung
    Chen, Tzu-Li
    JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2022, 45 (01) : 42 - 53
  • [9] Resource-constrained multi-project scheduling problem: A survey
    Gomez Sanchez, Mariam
    Lalla-Ruiz, Eduardo
    Gil, Alejandro Fernandez
    Castro, Carlos
    Voss, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 309 (03) : 958 - 976
  • [10] Resource Constrained Multi-project Scheduling: Application in Software Company
    Kurt, Pelin Akyil
    Kececi, Baris
    ADVANCES IN MANUFACTURING, PRODUCTION MANAGEMENT AND PROCESS CONTROL, 2019, 793 : 549 - 557