A PRACTICAL ALGORITHMIC APPROACH TOWARDS MULTI-MODAL RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEMS (MMRCMPSP)

被引:0
|
作者
Voelker, Michael [1 ]
Zahid, Taiba [1 ]
Schmidt, Thorsten [1 ]
机构
[1] Tech Univ Dresden, Fak Maschinenwesen, D-01062 Dresden, Germany
关键词
Operations management; constrained scheduling; multi-modes; heuristics; SEARCH ALGORITHM;
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The literature concerning resource constrained project scheduling problems (RCPSP) are mainly based on series or parallel schedule generation schemes with priority sequencing rules to resolve conflicts. Recently, these models have been extended for scheduling multi-modal RCPSP (MMRCPSP) where each activity has multiple possibilities to be performed thus providing decision managers a useful tool for manipulating resources and activities. Nonetheless, this further complicates the scheduling problem inflicted by increase of decision variables. Multiple heuristics have been proposed for this NP-hard problem. The main solution strategy adopted by such heuristics is a two loops decision strategy. Basically the problem is split between two parts where first part is conversion of MMRCPSP to RCPSP (mode fix) while second is finding feasible solution for a resource constrained project and is restricted to single project environments. This research aims on the development of scheduling heuristics, exploring the possibilities of scheduling MMRCPSP with parallel assignment of modes while sequencing the activities. The work addresses Multi-Mode Resource Constrained Multi-Project Scheduling Problem, (MMRCMPSP) by formulating a mathematical model that regards practical requirements of working systems. The algorithm is made intelligent and flexible in order to adopt and shift among various defined heuristic rules under different objectives to function as a decision support tool for managers.
引用
下载
收藏
页数:10
相关论文
共 50 条
  • [41] A particle swarm optimization for resource-constrained multi-project scheduling problem
    Deng Linyi
    Lin Yan
    CIS: 2007 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND SECURITY, PROCEEDINGS, 2007, : 1010 - 1014
  • [42] A Modified Differential Evolution Algorithm for Resource Constrained Multi-project Scheduling Problem
    Yan, Rui
    Li, Weijia
    Jiang, Ping
    Zhou, Yinzhi
    Wu, Guoqing
    JOURNAL OF COMPUTERS, 2014, 9 (08) : 1922 - 1927
  • [43] Application of hybrid particle swarm optimization in resource constrained multi-project scheduling
    Du, Hui
    Lou, Pei-Huang
    Ye, Wen-Hua
    Journal of the Chinese Society of Mechanical Engineers, Transactions of the Chinese Institute of Engineers, Series C/Chung-Kuo Chi Hsueh Kung Ch'eng Hsuebo Pao, 2014, 35 (05): : 371 - 379
  • [44] EXPERIMENTAL IMPLEMENTATION OF A RESOURCE-CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM SOLVER
    Mihaly, Krisztian
    Forrai, Monika Kulcsarne
    Kulcsar, Gyula
    HUNGARIAN JOURNAL OF INDUSTRY AND CHEMISTRY, 2021, 49 (02): : 53 - 58
  • [45] Supply chain integrated resource-constrained multi-project scheduling problem
    Asadujjaman, Md.
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 194
  • [46] Collaborative evolutionary multi-project resource scheduling
    Shackelford, M
    Corne, D
    PROCEEDINGS OF THE 2001 CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1 AND 2, 2001, : 1131 - 1138
  • [47] A DECOMPOSITION APPROACH TO MULTI-PROJECT SCHEDULING
    DECKRO, RF
    WINKOFSKY, EP
    HEBERT, JE
    GAGNON, R
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 51 (01) : 110 - 118
  • [48] Resource-constrained multi-project scheduling: Priority rule performance revisited
    Browning, Tyson R.
    Yassine, Ali A.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 126 (02) : 212 - 228
  • [49] Resource constrained multi-project scheduling modeling under certainty and uncertainty duration
    Hu, Wen-Bin
    Yue, Yu
    Xu, Long
    Wang, Kai-Kai
    Xia, Chang
    Du, Bo
    Song, Wei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (11): : 2398 - 2408
  • [50] Resource Constrained Multi-Project Scheduling with Priority Rules & Analytic Hierarchy Process
    Singh, Amol
    24TH DAAAM INTERNATIONAL SYMPOSIUM ON INTELLIGENT MANUFACTURING AND AUTOMATION, 2013, 2014, 69 : 725 - 734