Design production and first commissioning results of tbe electrical feedboxes of the LHC

被引:0
|
作者
Perin, A. [1 ]
Atieh, S. [1 ]
Benda, V. [1 ]
Bertarelli, A. [1 ]
Bouillot, A. [1 ]
Brodzinski, K. [3 ]
Folch, R. [1 ]
Fydrych, J. [3 ]
Genet, M. [1 ]
Koczorowski, S. [1 ]
Metral, L. [1 ]
Miles, J. [1 ]
Millet, F. [1 ]
Polkovnikov, K. [2 ]
Rabehl, R. [4 ]
Serio, L. [1 ]
Sytchev, V. [2 ]
Sytnik, V. [2 ]
Trilhe, P. [1 ]
van Weelderen, R. [1 ]
Zhabitskiy, V. [2 ]
机构
[1] CERN, European Org Nucl Res, CH-1211 Geneva, Switzerland
[2] Inst High Energy, Moscow 142281, Russia
[3] Wroclaw Univ Technol, PL-50370 Wroclaw, Poland
[4] Fermilab Natl Accelerator Lab, Batavia, IL 60510 USA
关键词
electrical feedbox; HTS current leads; superconductor; busbar; LHC;
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
A total of 44 CERN designed cryogenic electrical feedboxes are needed to power the LHC superconducting magnets. The feedboxes include more than 1000 superconducting circuits fed by high temperature superconductor and conventional current leads ranging from 120 A to 13 kA. In addition to providing the electrical current to the superconducting circuits, they also ensure specific mechanical and cryogenic functions for the LHC. The paper focuses on the main design aspects and related production operations and gives an overview of specific technologies employed. Results of the commissioning of the feedboxes of the first LHC sectors are presented.
引用
收藏
页码:747 / +
页数:2
相关论文
共 50 条
  • [31] ArDM: first results from underground commissioning
    Badertscher, A.
    Bay, F.
    Bourgeois, N.
    Cantini, C.
    Curioni, A.
    Daniel, M.
    Degunda, U.
    Di Luise, S.
    Epprecht, L.
    Gendotti, A.
    Horikawa, S.
    Knecht, L.
    Lussi, D.
    Maire, G.
    Montes, B.
    Murphy, S.
    Natterer, G.
    Nikolics, K.
    Nguyen, K.
    Periale, L.
    Ravat, S.
    Resnati, F.
    Romero, L.
    Rubbia, A.
    Santorelli, R.
    Sergiampietri, F.
    Sgalaberna, D.
    Viant, T.
    Wu, S.
    JOURNAL OF INSTRUMENTATION, 2013, 8
  • [32] The NEW detector: construction, commissioning and first results
    Nebot-Guinot, M.
    XXVII INTERNATIONAL CONFERENCE ON NEUTRINO PHYSICS AND ASTROPHYSICS (NEUTRINO2016), 2017, 888
  • [33] Commissioning and first results of the Fermilab Muon Campus
    Stratakis, Diktys
    Drendel, Brian
    Morgan, James P.
    Syphers, Michael J.
    Froemming, Nathan S.
    PHYSICAL REVIEW ACCELERATORS AND BEAMS, 2019, 22 (01):
  • [34] First commissioning results from Hall A at TJNAF
    Michaels, R
    INTERSECTIONS BETWEEN PARTICLE AND NUCLEAR PHYSICS - 6TH CONFERENCE, 1997, (412): : 307 - 310
  • [35] DESIGN AND COMMISSIONING OF THE ENERGY EXTRACTION SYSTEMS FOR THE LHC CORRECTOR MAGNET CIRCUITS
    Coelingh, G. J.
    Dahlerup-Petersen, K.
    Erokhin, A.
    Gorchakov, K.
    Medvedko, A.
    PROCEEDINGS OF THE 2008 IEEE INTERNATIONAL POWER MODULATORS AND HIGH VOLTAGE CONFERENCE, 2008, : 465 - +
  • [36] The commissioning and the first operational experiences of the CMS RPC detector control system at LHC
    Polese, G.
    Paolucci, P.
    Viviani, C.
    Sharzad, H.
    Khurshid, T.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2012, 661 : S23 - S26
  • [37] Commissioning of the Scintillator Pad Detector of LHCb with cosmic rays and first LHC collisions
    Vazquez Gomez, Ricardo
    XIV INTERNATIONAL CONFERENCE ON CALORIMETRY IN HIGH ENERGY PHYSICS (CALOR 2010), 2011, 293
  • [38] The Atlas Liquid Argon Calorimeter: Commissioning with Cosmic Muons and First LHC Beams
    Trocme, B.
    NUCLEAR PHYSICS B-PROCEEDINGS SUPPLEMENTS, 2009, 197 : 139 - 142
  • [39] First results on bilepton production based on LHC collision data and predictions for run II
    Nepomuceno, A. A.
    Eccard, F. L.
    Meirose, B.
    PHYSICAL REVIEW D, 2016, 94 (05)
  • [40] Results from commissioning and/or prototypes for new small (HL-)LHC experiments
    Neuhaus, Friedemann
    NINTH ANNUAL CONFERENCE ON LARGE HADRON COLLIDER PHYSICS, LHCP2021, 2021,