The commissioning and the first operational experiences of the CMS RPC detector control system at LHC

被引:0
|
作者
Polese, G. [1 ]
Paolucci, P. [2 ]
Viviani, C. [3 ,4 ]
Sharzad, H. [5 ]
Khurshid, T. [5 ]
机构
[1] Univ Bari, I-70126 Bari, Italy
[2] Ist Nazl Fis Nucl, Sez Napoli, Milan, Italy
[3] Univ Pavia, Dipartimento Fis Nucl & Teor, I-27100 Pavia, Italy
[4] Sezione Ist Nazl Fis Nucl, I-27100 Pavia, Italy
[5] Natl Ctr Phys, Islamized, Pakistan
关键词
CMS; Resistive Plate Chamber; Control systems; Commissioning;
D O I
10.1016/j.nima.2010.08.028
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
The CMS Resistive Plate Chambers (RPC) system consists of 912 double-gap chambers. The challenging constrains on the design and operation of this system imposed the development of a complex Detector Control System to assure the operational stability and reliability of a so large and complex detector and trigger system. The final layout and functionality of the CMS RPC DCS as well as the operational experience during the detector's commissioning and first phase of LHC operation are presented here. (C) 2010 Elsevier BY. All rights reserved.
引用
收藏
页码:S23 / S26
页数:4
相关论文
共 50 条
  • [1] Optimization of the Gas System in the CMS RPC Detector at the LHC
    Seo, Jiwoong
    2013 IEEE NUCLEAR SCIENCE SYMPOSIUM AND MEDICAL IMAGING CONFERENCE (NSS/MIC), 2013,
  • [2] The Commissioning of the CMS ECAL Detector with Cosmics and First LHC Beams
    Thea, Alessandro
    2009 16TH IEEE-NPSS REAL TIME CONFERENCE, 2009, : 559 - 564
  • [3] Uniformity and stability of the CMS RPC detector at the LHC
    Costantini, S.
    Beernaert, K.
    Cimmino, A.
    Garcia, G.
    Lellouch, J.
    Marinov, A.
    Ocampo, A.
    Strobbe, N.
    Thyssen, F.
    Tytgat, M.
    Verwilligen, P.
    Yazgan, E.
    Zaganidis, N.
    Dimitrov, A.
    Hadjiiska, R.
    Litov, L.
    Pavlov, B.
    Petkov, P.
    Aleksandrov, A.
    Genchev, V.
    Iaydjiev, P.
    Rodozov, M.
    Shopova, M.
    Sultanov, G.
    Ban, Y.
    Cai, J.
    Ge, Y.
    Li, Q.
    Qian, S.
    Xue, Z.
    Avila, C.
    Chaparro, L. F.
    Gomez, J. P.
    Moreno, B. Gomez
    Oliveros, A. F. Osorio
    Sanabria, J. C.
    Assran, Y.
    Sharma, A.
    Abbrescia, M.
    Calabria, C.
    Colaleo, A.
    Loddo, F.
    Maggi, M.
    Pugliese, G.
    Benussi, L.
    Bianco, S.
    Colafranceschi, S.
    Piccolo, D.
    Buontempo, S.
    Carrillo, C.
    JOURNAL OF INSTRUMENTATION, 2013, 8
  • [4] The RPC system for the CMS experiment at the LHC
    Abbrescia, M
    Colaleo, A
    Iaselli, G
    Loddo, F
    Maggi, M
    Marangelli, B
    Natali, S
    Nuzzo, S
    Pugliese, G
    Ranieri, A
    Romano, F
    Altieri, S
    Belli, G
    Bruno, G
    Guida, R
    Ratti, SP
    Riccardi, C
    Torre, P
    Vitulo, P
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2003, 508 (1-2): : 137 - 141
  • [5] RPC link box control system for RPC detector in LHC experiment
    Zabolotny, WM
    Kudla, IM
    Pozniak, K
    Kierzkowski, K
    Pietrusinski, M
    Wrochna, G
    Krolikowski, J
    Photonics Applications in Astronomy, Communications, Industry, and High-Energy Physics Experiments III, 2005, 5775 : 131 - 138
  • [6] CMS RPC commissioning of the existing detector during the long shutdown
    Cimmino, A.
    Ban, Y.
    Cai, J.
    Li, Q.
    Liu, S.
    Qian, S.
    Wang, D.
    Xu, Z.
    Zhang, F.
    Choi, Y.
    Kim, D.
    Goh, J.
    Choi, S.
    Hong, B.
    Kang, J. W.
    Kang, M.
    Kwon, J. H.
    Lee, K. S.
    Lee, S. K.
    Park, S. K.
    Pant, L. M.
    Mohanty, A. K.
    Chudasama, R.
    Singh, J. B.
    Bhatnagar, V.
    Mehta, A.
    Kumar, R.
    Cauwenbergh, S.
    Costantini, S.
    Crucy, S.
    Fagot, A.
    Garcia, G.
    Ocampo, A.
    Poyraz, D.
    Salva, S.
    Thyssen, F.
    Tytgat, M.
    Zaganidis, N.
    Doninck, W. V.
    Cabrera, A.
    Chaparro, L.
    Gomez, J. P.
    Gomez, B.
    Sanabria, J. C.
    Avila, C.
    Ahmad, A.
    Muhammad, S.
    Shoaib, M.
    Hoorani, H.
    Awan, I.
    JOURNAL OF INSTRUMENTATION, 2014, 9
  • [7] The upgrade of the CMS RPC system during the first LHC long shutdown
    Tytgat, M.
    Marinov, A.
    Verwilligen, P.
    Zaganidis, N.
    Aleksandrov, A.
    Genchev, V.
    Iaydjiev, P.
    Rodozov, M.
    Shopova, M.
    Sultanov, G.
    Assran, Y.
    Abbrescia, M.
    Calabria, C.
    Colaleo, A.
    Iaselli, G.
    Loddo, F.
    Maggi, M.
    Pugliese, G.
    Benussi, L.
    Bianco, S.
    Caponero, M.
    Colafranceschi, S.
    Felli, F.
    Piccolo, D.
    Saviano, G.
    Carrillo, C.
    Berzano, U.
    Gabusi, M.
    Vitulo, P.
    Kang, M.
    Lee, K. S.
    Park, S. K.
    Shin, S.
    Sharma, A.
    JOURNAL OF INSTRUMENTATION, 2013, 8
  • [8] Commissioning of the helium refrigeration system for the compact muon solenoid (CMS) detector of LHC
    Perinic, G.
    Dupont, T.
    ADVANCES IN CRYOGENIC ENGINEERING, VOLS 51A AND B, 2006, 823 : 2026 - +
  • [9] Gas Analysis and Monitoring Systems for the RPC Detector of CMS at LHC
    Bianco, Stefano
    2006 IEEE NUCLEAR SCIENCE SYMPOSIUM CONFERENCE RECORD, VOL 1-6, 2006, : 891 - 894
  • [10] Commissioning and Early Measurements of the DT Muon Detector of CMS at the LHC
    Perrotta, Andrea
    2008 IEEE NUCLEAR SCIENCE SYMPOSIUM AND MEDICAL IMAGING CONFERENCE (2008 NSS/MIC), VOLS 1-9, 2009, : 2081 - 2086