A general MILP model for scheduling of batch process with sequence-dependent changeover

被引:0
|
作者
Wu, JY [1 ]
He, XR [1 ]
Chen, BZ [1 ]
Qiu, T [1 ]
机构
[1] Tsing Hua Univ, Dept Chem Engn, Beijing 100084, Peoples R China
关键词
batch process; scheduling; sequence-dependent changeover; MILP;
D O I
暂无
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
In the scheduling models for batch processes, changeovers are considered to be sequence-dependent, which is the most general situation, or only unit-depended. In recent literature, most continuous-time methods only consider unit-dependend changeovers, which cannot represent the rea world situation In this paper, a new M-ULP model for scheduling of batch process with sequence-dependent changeovers has been presented. It is based on a new continuous-time representation method that dose not rely on the definition of time slots. Accessorial binary variables are introduced to indicate whether there is any task processed at each unit so that the sequence constraints are presented in a more compact way. Computational case study has shown the efficiency of the new model.
引用
收藏
页码:1076 / 1081
页数:6
相关论文
共 50 条
  • [41] Sequence-dependent model of allosteric communication
    Guarnera, Enrico
    Berezovsky, Igor N.
    [J]. JOURNAL OF CHEMICAL PHYSICS, 2023, 158 (13):
  • [42] Planning models for parallel batch reactors with sequence-dependent changeovers
    Erdirik-Dogan, Muge
    Grossmann, Ignacio E.
    [J]. AICHE JOURNAL, 2007, 53 (09) : 2284 - 2300
  • [43] An MILP Model for Energy-Conscious Flexible Job Shop Problem with Transportation and Sequence-Dependent Setup Times
    Meng, Leilei
    Zhang, Biao
    Gao, Kaizhou
    Duan, Peng
    [J]. SUSTAINABILITY, 2023, 15 (01)
  • [44] Hot-rolled batch scheduling algorithm for seamless steel tube with sequence-dependent setup times and tardiness
    Wang Y.
    Li T.-K.
    Wang B.-L.
    [J]. Kongzhi yu Juece/Control and Decision, 2021, 36 (02): : 505 - 512
  • [45] MILP model for scheduling and design of a special class of multipurpose batch plants
    Voudouris, VT
    Grossmann, IE
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 1996, 20 (11) : 1335 - 1360
  • [46] A novel predictive-reactive scheduling method for parallel batch processor lot-sizing and scheduling with sequence-dependent setup time
    Qiu, Junhao
    Liu, Jianjun
    Peng, Chengfeng
    Chen, Qingxin
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 189
  • [47] An Intuitive and Efficient Approach to Process Scheduling with Sequence-Dependent Changeovers Using Timed Automata Models
    Subbiah, Subanatarajan
    Schoppmeyer, Christian
    Engell, Sebastian
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2011, 50 (09) : 5131 - 5152
  • [48] Makespan minimization of a flowshop sequence-dependent group scheduling problem
    Nasser Salmasi
    Rasaratnam Logendran
    Mohammad Reza Skandari
    [J]. The International Journal of Advanced Manufacturing Technology, 2011, 56 : 699 - 710
  • [49] Permutation flowshops in group scheduling with sequence-dependent setup times
    Naderi, B.
    Salmasi, Nasser
    [J]. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2012, 6 (02) : 177 - 198
  • [50] Parallel Servers Scheduling with Dynamic Sequence-Dependent Setup Time
    Thanh-Cong Dinh
    Bae, Hyerim
    [J]. INTELLIGENT DECISION TECHNOLOGIES (IDT'2012), VOL 2, 2012, 16 : 79 - 87