Effects of pipeline distance, injectivity and capacity on CO2 pipeline and storage site selection

被引:11
|
作者
Wang, Z. [1 ,2 ]
Weihs, G. A. Fimbres [1 ,2 ,3 ]
Neal, P. R. [1 ,4 ]
Wiley, D. E. [1 ,2 ,5 ]
机构
[1] CO2CRC Ltd, Melbourne, Vic, Australia
[2] UNSW Sydney, UNSW Australia, Sch Chem Engn, Sydney, NSW 2052, Australia
[3] Inst Tecnol Sonora, Catedras CONACYT, Obregon 85130, Sonora, Mexico
[4] UNSW Sydney, UNSW Australia, Sch Petr Engn, Sydney, NSW 2052, Australia
[5] Univ Sydney, Sch Chem & Biomol Engn, Sydney, NSW 2006, Australia
关键词
Carbon capture and storage; Pipeline optimisation; Sink capacity; Injectivity; CARBON CAPTURE; TRANSPORT; CCS; DESIGN; SCALE; COST;
D O I
10.1016/j.ijggc.2016.05.006
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Optimising CO2 transport and injection is a challenging issue in Carbon Capture and Storage (CCS), not only because of the complexity of the problem, but also because of timing effects when introducing new sources and/or sinks into the CO2 transport infrastructure. In particular, the effects of storage capacity, injection site location and reservoir properties can propagate to capture and transport costs, affecting the design of the CO2 pipelines. For example, if an injection site does not have enough capacity to store the total amount of CO2 from a capture project, decision makers would need to consider whether to use a larger capacity site, or use the site with small capacity and later switch to a larger capacity site or use both sites. This paper considers the effects of storage capacity, injectivity and distance to source of two sinks on optimal CO2 transport infrastructure design and a static supply of CO2. Optimal pipeline configurations and sink selection were determined under different combinations of CO2 flow rate, pipeline length and storage site properties. In one scenario, two sinks both have infinite capacity but different injectivities and distances to the emission source. In the other scenario, one sink is relatively small but has a better injectivity or proximity to the emission source. A decision tree approach was developed to provide a quick method for high-level sink selection and pipeline routing for the two scenarios based on the key project parameters including sink capacity, injectivities, pipeline distances and well cost. The scenarios where the decision trees may be useful for simplifying the design of large-scale CO2 pipeline networks have also been analysed. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:95 / 105
页数:11
相关论文
共 50 条
  • [21] STUDY ON LEAKAGE MONITORING METHOD OF SUPERCRITICAL CO2 LONG-DISTANCE PIPELINE
    Guo, Xiaolu
    Fan, Zhichao
    Xu, Shuangqing
    PROCEEDINGS OF ASME 2022 PRESSURE VESSELS AND PIPING CONFERENCE, PVP2022, VOL 3, 2022,
  • [22] Consequence modelling of CO2 pipeline failure
    Liu, Xiong
    Godbole, Ajit
    Lu, Cheng
    Michal, Guillaume
    Linton, Valerie
    INNOVATIVE SOLUTIONS FOR ENERGY TRANSITIONS, 2019, 158 : 5109 - 5115
  • [23] CO2 corrosion on a natural gas pipeline
    不详
    MATERIALS PERFORMANCE, 2000, 39 (12) : 61 - 61
  • [24] Inhibitors for wet CO2 pipeline service
    不详
    MATERIALS PERFORMANCE, 2013, 52 (04) : 12 - 15
  • [25] Inhibitors for wet CO2 pipeline service
    不详
    MATERIALS PERFORMANCE, 2007, 46 (01) : 51 - 51
  • [26] Corrosion Electrochemical of CO2 Pipeline Steel
    Chen, Bing
    Ju, Rongbing
    Ruan, Yinghao
    PROCEEDINGS OF THE INTERNATIONAL FIELD EXPLORATION AND DEVELOPMENT CONFERENCE 2017, 2019, : 1460 - 1467
  • [27] CO2 Pipeline infrastructure - lessons learnt
    Noothout, Paul
    Wiersma, Frank
    Hurtado, Omar
    Macdonald, Doug
    Kemper, Jasmin
    van Alphen, Klaas
    12TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, GHGT-12, 2014, 63 : 2481 - 2492
  • [28] Economic optimization of CO2 pipeline configurations
    Knoope, M. M. J.
    Ramirez, A.
    Faaij, A. P. C.
    GHGT-11, 2013, 37 : 3105 - 3112
  • [29] Optimization of pipeline transport for CO2 sequestration
    Zhang, ZX
    Wang, GX
    Massarotto, P
    Rudolph, V
    ENERGY CONVERSION AND MANAGEMENT, 2006, 47 (06) : 702 - 715
  • [30] Inhibitors for wet CO2 pipeline service
    不详
    MATERIALS PERFORMANCE, 2015, 54 (05) : 10 - 11