Scheduling n jobs on one machine to minimize the maximum lateness with a minimum number of tardy jobs

被引:16
|
作者
Chang, PC
Su, LH
机构
[1] Yuan Ze Univ, Dept Ind Engn, Chungli 32026, Taoyuan, Taiwan
[2] Chung Yuan Christian Univ, Dept Ind Engn, Chungli 32023, Taiwan
关键词
the critical jobs; the critical path; minimize the maximum lateness; a minimum number of tardy jobs; branch and bound;
D O I
10.1016/S0360-8352(01)00035-3
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This study considers the problem of scheduling n jobs, each job having an arrival time, a processing time and a due date, on a single machine with the dual objective of minimizing the maximum lateness subject to obtaining a minimum number of tardy jobs. A simple procedure is introduced to identify two critical jobs from which the maximum lateness is generated for a given sequence. The sequence of jobs between two critical jobs inclusive is called the critical path. On the basis of the critical path, Carlier's binary branching rule is adopted to minimize the maximum lateness. By fixing the position of these two critical jobs for maintaining the minimum maximum lateness, the sequence can further be reordered to reduce the number of tardy jobs. A branch and bound algorithm is presented for this purpose. The algorithm can solve problems with 50 jobs optimally within 5 seconds on a PC Pentium-100. (C) 2001 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:349 / 360
页数:12
相关论文
共 50 条
  • [31] Single-Machine Scheduling to Minimize Absolute Value in Maximum Lateness with Deteriorating Jobs
    Wang, Ji-Bo
    Yang, Dar-Li
    Hsu, Chou-Jung
    [J]. ADVANCED MANUFACTURING SYSTEMS, PTS 1-3, 2011, 201-203 : 1054 - +
  • [32] Parallel machine scheduling with minimum number of tardy jobs: Approximation and exponential algorithms
    Della Croce, Federico
    T'kindt, Vincent
    Ploton, Olivier
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2021, 397
  • [33] Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem
    Molaee, Ehsan
    Moslehi, Ghasem
    Reisi, Mohammad
    [J]. COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2010, 60 (11) : 2909 - 2919
  • [34] A bicriteria approach to minimize number of tardy jobs and resource consumption in scheduling a single machine
    Yedidsion, Liron
    Shabtay, Dvir
    Korach, Ephraim
    Kaspi, Moshe
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 119 (02) : 298 - 307
  • [35] Uniform parallel-machine scheduling to minimize the number of tardy jobs in the MapReduce system
    Zheng, Feifeng
    Huang, Jidan
    [J]. PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 124 - 129
  • [36] SCHEDULING ON A SINGLE-MACHINE WITH A SINGLE BREAKDOWN TO MINIMIZE STOCHASTICALLY THE NUMBER OF TARDY JOBS
    ADIRI, I
    FROSTIG, E
    KAN, AHGR
    [J]. NAVAL RESEARCH LOGISTICS, 1991, 38 (02) : 261 - 271
  • [37] MINIMIZING THE NUMBER OF TARDY JOBS IN IDENTICAL MACHINE SCHEDULING
    SUER, GA
    BAEZ, E
    CZAJKIEWICZ, Z
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1993, 25 (1-4) : 243 - 246
  • [38] SINGLE-MACHINE SCHEDULING TO MINIMIZE THE WEIGHTED NUMBER OF EARLY AND TARDY AGREEABLE JOBS
    LI, CL
    CHENG, TCE
    CHEN, ZL
    [J]. COMPUTERS & OPERATIONS RESEARCH, 1995, 22 (02) : 205 - 219
  • [39] A stronger complexity result for the single machine multi-operation jobs scheduling problem to minimize the number of tardy jobs
    Cheng, TCE
    Ng, CT
    Yuan, JJ
    [J]. JOURNAL OF SCHEDULING, 2003, 6 (06) : 551 - 555
  • [40] A Stronger Complexity Result for the Single Machine Multi-Operation Jobs Scheduling Problem to Minimize the Number of Tardy Jobs
    T. C. E. Cheng
    C. T. Ng
    J. J. Yuan
    [J]. Journal of Scheduling, 2003, 6 : 551 - 555