共 50 条
SCHEDULING ON A SINGLE-MACHINE WITH A SINGLE BREAKDOWN TO MINIMIZE STOCHASTICALLY THE NUMBER OF TARDY JOBS
被引:0
|作者:
ADIRI, I
FROSTIG, E
KAN, AHGR
机构:
[1] HAIFA UNIV,DEPT STAT,HAIFA,ISRAEL
[2] ERASMUS UNIV,INST ECONOMETR,3000 DR ROTTERDAM,NETHERLANDS
关键词:
D O I:
10.1002/1520-6750(199104)38:2<261::AID-NAV3220380210>3.0.CO;2-I
中图分类号:
C93 [管理学];
O22 [运筹学];
学科分类号:
070105 ;
12 ;
1201 ;
1202 ;
120202 ;
摘要:
Jobs with known processing times and due dates have to be processed on a machine which is subject to a single breakdown. The moment of breakdown and the repair time are independent random variables. Two cases are distinguished with reference to the processing time preempted by the breakdown (no other preemptions are allowed): (i) resumption without time losses and (ii) restart from the beginning. Under certain compatible conditions, we find the policies which minimize stochastically the number of tardy jobs.
引用
收藏
页码:261 / 271
页数:11
相关论文