An integrative contingency model of software project risk management

被引:216
|
作者
Barki, H [1 ]
Rivard, S
Talbot, J
机构
[1] Dept Informat Technol, Montreal, PQ, Canada
[2] Ecole Hautes Etud Commerciales, HEC, Montreal, PQ, Canada
关键词
contingency models; software project management; software project risk;
D O I
10.1080/07421222.2001.11045666
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Drawing both from the IS literature on software project risk management and the contingency research in Organization Theory literature, the present study develops an integrative contingency model of software project risk management. Adopting a profile deviation perspective of fit, the outcome of a software development project (Performance) is hypothesized to be influenced by the fit between the project's risk (Risk Exposure) and how project risk is managed (Risk Management Profile). The research model was tested with longitudinal data obtained from project leaders and key users of 75 software projects. The results support the contingency model proposed and suggest that in order to increase project performance a project's risk management profile needs to vary according to the project's risk exposure. Specifically, high-risk projects were found to call for high information processing capacity approaches in their management. However, the most appropriate management approach was found td depend on the performance criterion used. When meeting project budgets was the performance criterion, successful high-risk projects had high levels of internal integration, as well as high levels of formal planning. When system quality was the performance criterion, successful high-risk projects had high levels of user participation.
引用
收藏
页码:37 / 69
页数:33
相关论文
共 50 条
  • [1] An integrative framework for intelligent software project risk planning
    Hu, Yong
    Du, Jianfeng
    Zhang, Xiangzhou
    Hao, Xiaoling
    Ngai, E. W. T.
    Fan, Ming
    Liu, Mei
    [J]. DECISION SUPPORT SYSTEMS, 2013, 55 (04) : 927 - 937
  • [2] Devising new Software Project Risk Management Model: MARUNA
    Fetaji, Bekim
    [J]. TEM JOURNAL-TECHNOLOGY EDUCATION MANAGEMENT INFORMATICS, 2012, 1 (04): : 302 - 307
  • [3] Risk Management in Project Portfolios Is More Than Managing Project Risks: A Contingency Perspective on Risk Management
    Teller, Juliane
    Kock, Alexander
    Gemuenden, Hans Georg
    [J]. PROJECT MANAGEMENT JOURNAL, 2014, 45 (04) : 67 - 80
  • [4] Identifying Risks of Software Project Management in Global Software Development: An Integrative Framework
    Yasser Chadli, Saad
    Idri, Ali
    Luis Fernandez-Aleman, Jose
    Nicolas Ros, Joaquin
    Toval, Ambrosio
    [J]. 2016 IEEE/ACS 13TH INTERNATIONAL CONFERENCE OF COMPUTER SYSTEMS AND APPLICATIONS (AICCSA), 2016,
  • [5] Enhancements in software project risk management
    Wieland, P
    Hogberg, F
    Stromseng, K
    [J]. RELIABLE SOFTWARE TECHNOLOGIES ADA-EUROPE 2000, 2000, 1845 : 161 - 172
  • [6] Risk management of software engineering project
    Zhang, CK
    [J]. Proceedings of the 4th International Conference on Quality & Reliability, 2005, : 315 - 318
  • [7] Japan Software Project Risk Management
    Cui Wei
    Ye Jia
    Lin Yan
    Qian Si-yu
    Liu Yang
    Yang Hai-feng
    Li Ya-jun
    [J]. MANUFACTURING SYSTEMS AND INDUSTRY APPLICATIONS, 2011, 267 : 175 - 178
  • [8] A Software Project Management Simulation Model Based on Risk Factors Analysis
    Ji, Nianfang
    [J]. PROCEEDINGS OF INTERNATIONAL SYMPOSIUM ON STATISTICS AND MANAGEMENT SCIENCE 2010, 2010, : 90 - 95
  • [9] An integrative model of information technology project management
    Ehikioya, SA
    [J]. WORLD MULTICONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL 1, PROCEEDINGS: INFORMATION SYSTEMS, 1999, : 26 - 33
  • [10] Software project management maturity assessment model to assess software project management practices
    Fauzi, Shukor Sanim Bin Mohd
    Ramli, Nuraminah Bt
    [J]. ICCSA 2007: PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE AND APPLICATIONS, 2007, : 375 - +