共 50 条
- [41] EXPERIENCE FROM OPERATION OF OSKARSHAMN UNIT NO. 1. 1600, Int At Energy Agency (Proc Ser, STI/PUB/351), Vienna, Austria
- [42] Elevated Apolipoprotein B/A-1 Ratio is Associated With an Increased Risk of Aortic Stenosis: Experience From the AMORIS Cohort HEART LUNG AND CIRCULATION, 2021, 30 (07): : 1050 - 1057
- [43] LESSONS LEARNED FROM THE DECOMMISSIONING PROCESS AFFECTED BY AN ACCIDENT DURING OPERATION. THE CASE OF A1 NPP IN SLOVAKIA ICEM2007: PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL REMEDIATION AND RADIOACTIVE WASTE MANAGEMENT, PTS A AND B, 2009, : 411 - 419
- [44] COMMISSIONING AND 1ST OPERATING EXPERIENCE AT DARLINGTON TRITIUM REMOVAL FACILITY FUSION TECHNOLOGY, 1988, 14 (02): : 472 - 479
- [46] A New Approach to Humanitarian DeminingPart 1: Mobile Platform for Operation on Unstructured Terrain Autonomous Robots, 2005, 18 : 303 - 321
- [47] Experience with reconstruction and operation of the no. 1 Ivanovo TPP (TÉTs-1) Power Technol. Eng., 2007, 6 (355-359): : 355 - 359
- [48] The NIO1 Negative Ion Source: Investigation and Operation Experience SIXTH INTERNATIONAL SYMPOSIUM ON NEGATIVE IONS, BEAMS AND SOURCES (NIBS 2018), 2018, 2052
- [49] EXPERIENCE WITH THE OPERATION OF THE AAS-1 ATOMIC-ABSORPTION SPECTROPHOTOMETER INDUSTRIAL LABORATORY, 1982, 48 (04): : 410 - 411
- [50] Strength software maintenance for the trouble-free operation of NPP equipment. Report 1. Methodological backgrounds and implementation Trenie i Iznos, 1998, 19 (02): : 7 - 15