EXPERIENCE WITH OPERATION OF MOBILE CEMENTATION FACILITY AT A-1 NPP

被引:0
|
作者
Holicka, Zuzana [1 ]
Krajc, Tibor [1 ]
Kevicky, Dusan [1 ]
Urbanec, Marian [1 ]
机构
[1] VUJE Inc, Trnava 91864, Slovakia
来源
PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL REMEDIATION AND RADIOACTIVE WASTE MANAGEMENT 2009, VOL 1 | 2010年
关键词
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The purpose of the paper is to describe a mobile cementation facility (MCF), which was designed by VUJE, Inc. and by JAVYS, Inc. (Nuclear and Decommissioning Company) in 2003. MCF was constructed and installed in 2004 in the so-called garden nearby A-1 NPP in Jaslovske Bohunice, where underground storage tanks for liquid radioactive waste are located. The facility is designed to process liquid radioactive waste and sludge or gravel collected from the underground tanks. These storage tanks are situated in the vicinity of active water treatment plant belonging to A-1 NPP. The tanks, some of which are of diameter 16 m, have their internal complex structure. All tanks were designed to collect various liquid waste streams from the A-1 NPP reactor building. Special remotely controlled DENAR 41 manipulator was developed, for the collection of liquid waste as well as for other purposes (collection of solid waste, decontamination, cutting of internal pipelines, etc.) The unique mobile equipment, which carries a suitable pump for sludge pumping to the cementation facility, was used to collect sludge last year. Large diameter of the storage tanks and small hatchways for the inspection access (approximately 540 x 540 mm) through which the telescopic mast of manipulator DENAR 41 or the special mobile vehicle were inserted into the tanks proved to pose some difficulties while being at use. Standard ISO containers, in which the main components are installed, were designed and used for the MCF project. The whole equipment is relatively easy to transport and can be installed to any other tanks with stored liquid waste. In-drum mixing technology is applied during cementation process. Standard 200 litre drums with the cement product are the only outputs form the mobile cementation facility. Production of 200 litre drums with the cemented product gradually increased from 19 pieces per year in 2005 to 88 pieces last year in 2008. Several problems particularly in the cement dosing system as well as problems in monitoring and measurement system with occasional failures in control system appeared amidst MCF operation. However these issues were always operatively resolved and the cementation facility could successfully met desired expectations.
引用
收藏
页码:55 / 59
页数:5
相关论文
共 50 条
  • [21] Mobile content operation design: Lessons learned in the long-term experience
    Yamakami, T
    14TH INTERNATIONAL WORKSHOP ON DATABASE AND EXPERT SYSTEMS APPLICATIONS, PROCEEDINGS, 2003, : 186 - 190
  • [22] Military neurosurgery in operation: experience in the French role-3 medical treatment facility of Kabul
    Joubert, Christophe
    Dulou, Renaud
    Delmas, Jean Marc
    Desse, Nicolas
    Fouet, Mathilde
    Dagain, Arnaud
    ACTA NEUROCHIRURGICA, 2016, 158 (08) : 1453 - 1463
  • [23] Military neurosurgery in operation: experience in the French role-3 medical treatment facility of Kabul
    Christophe Joubert
    Renaud Dulou
    Jean Marc Delmas
    Nicolas Desse
    Mathilde Fouet
    Arnaud Dagain
    Acta Neurochirurgica, 2016, 158 : 1453 - 1463
  • [24] Operation and experience of a 2 km coated conductor REEL - to - REEL copper pulse plating facility
    Floegel-Delor, U.
    Riedel, T.
    Wippich, D.
    Rothfeld, R.
    Schirrmeister, P.
    Koenig, R.
    Werfel, F. N.
    Usoskin, A.
    Rutt, A.
    11TH EUROPEAN CONFERENCE ON APPLIED SUPERCONDUCTIVITY (EUCAS2013), PTS 1-4, 2014, 507
  • [25] EXPERIENCE WITH THE 1ST DESONOX PILOT-FACILITY
    OHLMS, N
    BRENNSTOFF-WARME-KRAFT, 1990, 42 (03): : L23 - &
  • [26] FIRST EXPERIENCE OF ONE YEARS OPERATION OF A MOBILE INTENSIVE CORONARY-CARE UNIT
    STEINBRUNN, W
    BAUMANN, PC
    BERCHTOLD, H
    FREY, P
    HEINZELMANN, F
    KREIENBUHL, G
    MOHR, P
    STUMP, W
    SCHWEIZERISCHE MEDIZINISCHE WOCHENSCHRIFT, 1973, 103 (50) : 1804 - 1805
  • [27] EXPERIENCE OF A YEARS TRIAL OPERATION OF A MOBILE INTENSIVE-CARE UNIT (KARDIOMOBIL) IN ZURICH
    STEINBRUNN, W
    BAUMANN, PC
    FREY, P
    KREIENBUHL, G
    SCHWEIZERISCHE MEDIZINISCHE WOCHENSCHRIFT, 1976, 106 (07) : 200 - 203
  • [28] A case study - Twenty years experience at the Smithsonian institution: The planning and operation of a cold storage facility for photographs
    Wallace, JH
    IS&T'S 2004 ARCHIVING CONFERENCE, PROCEEDINGS, 2004, : 172 - 175
  • [29] Experience with cryogenic operation of Accelerator Module Test Facility during testing of one third of XFEL cryomodules
    Anashin, V.
    Belova, L.
    Bozhko, Y.
    Escherich, K.
    Petersen, B.
    Putselyk, S.
    Pyata, E.
    Schnautz, T.
    Swierblewski, J.
    Zhirnov, A.
    ADVANCES IN CRYOGENIC ENGINEERING, 2015, 101
  • [30] Automated Bioprocess Feedback Operation in a High-Throughput Facility via the Integration of a Mobile Robotic Lab Assistant
    Kaspersetz, Lucas
    Waldburger, Saskia
    Schermeyer, M-Therese
    Riedel, Sebastian L.
    Gross, Sebastian
    Neubauer, Peter
    Cruz-Bournazou, M-Nicolas
    FRONTIERS IN CHEMICAL ENGINEERING, 2022, 4