Information technology and performance management for build-to-order supply chains

被引:25
|
作者
Sharif, Amir M. [1 ]
Irani, Zahir [1 ]
Lloyd, Don [1 ]
机构
[1] Brunel Univ, Brunel Business Sch, Uxbridge UB8 3PH, Middx, England
关键词
bespoke production; supply chain management; competitive strategy;
D O I
10.1108/01443570710830610
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - This paper aims to address the growth and importance of build-to-order (BTO) supply chains, which allow consumers and supply chain participants to select, configure, purchase and view order delivery status. The paper supports BTO as a source of critical competitive advantage to many organizations. Design/methodology/approach - This paper uses an interpretivist case study research strategy that exploits multiple research methods. It presents an overview of supply chain management (including BTO-centric approaches) and performance management and then focuses on a case study in which an aerospace components company was attempting to become a BTO enterprise. Thenceforth, the paper analyses key business drivers of using performance management systems (PeMS), and how supply chain-oriented organizations can best leverage IT and PeMS solutions in this regard. Findings - The case study has highlighted the need for the evaluation of PeMS implementation solutions regardless of their typology; wholly vendor-based, best of breed or combination of vendor solution and in-house development, but also an internal audit of processes and existing IS that would aid the implementation of such a concept. Furthermore, the intra- and inter-company political/social/commercial tensions (e.g. relating to anxieties about measuring and highlighting relative business performance) need to be recognized, acknowledged in an open/honest manner and addressed in order that such tensions do not outweigh the concept justifiers which drive systems improvements. Education, ownership, responsibility, sponsorship, openness and collaboration between and amongst the supply chain participants will aid in overcoming these barriers. Originality/value - This paper offers a novel insight into BTO supply chains.
引用
收藏
页码:1235 / 1253
页数:19
相关论文
共 50 条
  • [41] FAW-Volkswagen’s build-to-order model
    金晓彤
    王贺峰
    [J]. China Economist, 2010, (02) : 117 - 126
  • [42] INFORMATION TECHNOLOGY AND SYSTEMS IN TRANSPORT SUPPLY CHAINS
    Zhuravleva, Olga
    [J]. TRANSPORT PROBLEMS, 2013, 8 (01) : 67 - 72
  • [43] A robust optimization model for joint maintenance and build-to-order supply chain under uncertainties: A case study
    Ebrahimi, M.
    Tavakkoli-Moghaddam, Reza
    [J]. PROCEEDINGS OF 2019 15TH IRAN INTERNATIONAL INDUSTRIAL ENGINEERING CONFERENCE (IIIEC), 2019, : 141 - 150
  • [44] Planning of capacities and orders in build-to-order automobile production: A review
    Volling, Thomas
    Matzke, Andreas
    Grunewald, Martin
    Spengler, Thomas S.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 224 (02) : 240 - 260
  • [45] Heuristic Scheduling of Job Orders in a Build-to-Order Manufacturing System
    Wang, Chia-Nan
    Chou, Chien-Chang
    Chung, Yu-Chi
    Phan, Nguyen Ky Phuc
    Nguyen, Van Thanh
    Nguyen, Viet Tinh
    [J]. COMPUTER SYSTEMS SCIENCE AND ENGINEERING, 2022, 40 (03): : 1059 - 1072
  • [46] Build-to-order nanostructures using DNA self-assembly
    Asakawa, Takeshi
    Nishi, Kentaro
    Mizuno, Rika
    Yoneda, Kazuhiro
    Okada, Takao
    Hayashi, Kenshi
    [J]. THIN SOLID FILMS, 2006, 509 (1-2) : 85 - 93
  • [47] Optimal return policy and modular design for build-to-order products
    Mukhopadhyay, SK
    Setoputro, R
    [J]. JOURNAL OF OPERATIONS MANAGEMENT, 2005, 23 (05) : 496 - 506
  • [48] Improving value chain flexibility and adaptability in build-to-order environments
    Engelhardt-Nowitzki, Corinna
    [J]. INTERNATIONAL JOURNAL OF PHYSICAL DISTRIBUTION & LOGISTICS MANAGEMENT, 2012, 42 (04) : 318 - 337
  • [49] Heuristic Scheduling of Job Orders in a Build-to-Order Manufacturing System
    Wang, Chia-Nan
    Chou, Chien-Chang
    Chung, Yu-Chi
    Phuc Phan, Nguyen Ky
    Nguyen, Van Thanh
    Nguyen, Viet Tinh
    [J]. Computer Systems Science and Engineering, 2021, 40 (03):
  • [50] Active performance management in supply chains
    Ren, CR
    Chai, YT
    Liu, Y
    [J]. 2004 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN & CYBERNETICS, VOLS 1-7, 2004, : 6036 - 6041