Planning of capacities and orders in build-to-order automobile production: A review

被引:36
|
作者
Volling, Thomas [1 ]
Matzke, Andreas [1 ]
Grunewald, Martin [1 ]
Spengler, Thomas S. [1 ]
机构
[1] Tech Univ Carolo Wilhelmina Braunschweig, Inst Automot Management & Ind Prod, D-38106 Braunschweig, Germany
关键词
Production; Automotive industry; Planning framework; Capacity planning; Order-driven planning; Operations research; SUPPLY CHAIN MANAGEMENT; AUTOMOTIVE INDUSTRY; ASSEMBLY LINES; PROGRAMMING APPROACH; FLEXIBILITY; DESIGN; MODEL; RECONFIGURATION; FRAMEWORK; BENEFITS;
D O I
10.1016/j.ejor.2012.07.034
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In an attempt to achieve a competitive edge, automotive companies operate global production networks to offer an ever increasing product variety, shorter and reliable lead times as well as competitively priced products. Cars are no longer exclusively produced based on standardized product configurations and stable sales plans but are increasingly build-to-order to match the needs of individual customers. Operations Research (OR) may contribute towards successful build-to-order operations. This is likewise reflected by the appreciable number of published papers on industry specific OR applications. To provide readers with an overview about these OR models and applications we identify current and future research issues based on the review of 49 works. We focus on two important planning objects which have not been considered in prior reviews: the planning of capacities and orders. To bridge the gap between conceptual works on the one hand and quantitative contributions on the other, we provide a framework for the structuring of planning tasks. Existing models are classified according to this framework and open issues that should be addressed in OR are discussed. (C) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:240 / 260
页数:21
相关论文
共 50 条
  • [1] Modeling and simulation of order-driven planning policies in build-to-order automobile production
    Volling, Thomas
    Spengler, Thomas S.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 131 (01) : 183 - 193
  • [2] Heuristic Scheduling of Job Orders in a Build-to-Order Manufacturing System
    Wang, Chia-Nan
    Chou, Chien-Chang
    Chung, Yu-Chi
    Phan, Nguyen Ky Phuc
    Nguyen, Van Thanh
    Nguyen, Viet Tinh
    [J]. COMPUTER SYSTEMS SCIENCE AND ENGINEERING, 2022, 40 (03): : 1059 - 1072
  • [3] Heuristic Scheduling of Job Orders in a Build-to-Order Manufacturing System
    Wang, Chia-Nan
    Chou, Chien-Chang
    Chung, Yu-Chi
    Phuc Phan, Nguyen Ky
    Nguyen, Van Thanh
    Nguyen, Viet Tinh
    [J]. Computer Systems Science and Engineering, 2021, 40 (03):
  • [4] Flexibility and rigidity in custornization and build-to-order production
    Fredriksson, P
    Gadde, LE
    [J]. INDUSTRIAL MARKETING MANAGEMENT, 2005, 34 (07) : 695 - 705
  • [5] Automotive Industry Information Systems: From Mass Production to Build-to-Order
    Howard, Mickey
    Powell, Philip
    Vidgen, Richard
    [J]. JOURNAL OF CASES ON INFORMATION TECHNOLOGY, 2005, 7 (02) : 16 - 30
  • [6] Build-to-order supply chain management
    Gunasekaran, Angappa
    [J]. INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2007, 27 (11) : 1141 - 1143
  • [7] Developing a knowledge management platform for automotive build-to-order production network
    Smirnov, Alexander
    Shilov, Nikolay
    Kashevnik, Alexey
    [J]. HUMAN SYSTEMS MANAGEMENT, 2008, 27 (01) : 15 - 30
  • [8] Build-to-order supply chain management: a literature review and framework for development
    Gunasekaran, A
    Ngai, EWT
    [J]. JOURNAL OF OPERATIONS MANAGEMENT, 2005, 23 (05) : 423 - 451
  • [9] A robust optimization model for agile and build-to-order supply chain planning under uncertainties
    Morteza Lalmazloumian
    Kuan Yew Wong
    Kannan Govindan
    Devika Kannan
    [J]. Annals of Operations Research, 2016, 240 : 435 - 470
  • [10] Fuzzy scheduling of a build-to-order supply chain
    Demirli, Kudret
    Yimer, Alebachew D.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (14) : 3931 - 3958