Extended-reach stimulation with coiled tubing: A case study

被引:0
|
作者
Patrick, K
Hornett, M
Foose, J
机构
来源
JOURNAL OF PETROLEUM TECHNOLOGY | 2003年 / 55卷 / 11期
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The number of extended reach horizontal Wells is increasing as operators seek to maximize well production. As die length of the horizontal section increases, so does the challenge of openhole stimulation. The Full-length paper reviews stages of planning, design/modeling, and, operations required to stimulate a deep openhole horizontal re-entry well with coiled tubing (CT). The well was completed to a depth of 21,670 ft with end of tubing at 18,308 ft. The 3,363-ft openhole section was drilled with a 57/8-in. bit. A 1 3/4-in. tapered CT string was designed to reach total depth (TD) unassisted by any extended-reach bottomhole assembly (BRA).
引用
收藏
页码:45 / 46
页数:2
相关论文
共 50 条
  • [41] Transport of small cuttings in extended-reach drilling
    Duan, Mingqin
    Miska, Stefan
    Yu, Mengjiao
    Takach, Nicholas
    Ahmed, Ramadan
    Zettner, Claudia
    SPE Drilling and Completion, 2008, 23 (03): : 258 - 265
  • [42] Prediction of casing wear in extended-reach drilling
    Gao Deli Sun Lianzhong and Lian Jihong Key Laboratory of Petroleum Engineering Ministry of Education China University of Petroleum Beijing China CACT Operators Group Shenzhen Guangdong China
    Petroleum Science, 2010, 7 (04) : 494 - 501
  • [43] Prediction of casing wear in extended-reach drilling
    Gao Deli
    Sun Lianzhong
    Lian Jihong
    PETROLEUM SCIENCE, 2010, 7 (04) : 494 - 501
  • [44] Planning a record extended-reach well in Japan
    Petroleum Engineer International, 1996, 69 (04):
  • [45] Next generation of Sakhalin extended-reach drilling
    JPT, Journal of Petroleum Technology, 2006, 58 (07):
  • [46] Extended-reach composite-materials drillpipe
    Hareland, G
    Lyons, WC
    Baldwin, DD
    Briggs, GM
    Bratli, RK
    SPE DRILLING & COMPLETION, 1998, 13 (02) : 114 - 120
  • [47] BP completes record extended-reach well
    Knott, D
    OIL & GAS JOURNAL, 1998, 96 (03) : 24 - 26
  • [48] Optical Technologies in Extended-Reach Access Networks
    Wong, Elaine
    Amaya, Ferney A.
    Monroy, Idelfonso T.
    2009 LASERS & ELECTRO-OPTICS & THE PACIFIC RIM CONFERENCE ON LASERS AND ELECTRO-OPTICS, VOLS 1 AND 2, 2009, : 271 - +
  • [49] The effect of fluid flow on coiled-tubing reach
    Bhalla, K
    Walton, IC
    SPE PRODUCTION & FACILITIES, 1998, 13 (01): : 59 - 63
  • [50] Evaluating stabilizing initiatives to extend coiled tubing reach
    Liljenhjerte, Johannes
    Nygaard, Jens Vinge
    JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2021, 205