The effect of fluid flow on coiled-tubing reach

被引:1
|
作者
Bhalla, K [1 ]
Walton, IC
机构
[1] Stress Engn Serv Inc, Houston, TX USA
[2] Dowell, Rosharon, TX USA
来源
SPE PRODUCTION & FACILITIES | 1998年 / 13卷 / 01期
关键词
D O I
10.2118/36464-PA
中图分类号
TE [石油、天然气工业];
学科分类号
0820 ;
摘要
A critical parameter for the success of many coiled-tubing (CT) operations in highly deviated or horizontal wells is the depth penetration that can be attained before the CT buckles and locks up. Achieving a desired depth is always critical in CT operations, and attaining an additional reach of a few hundred feet can be crucial. This paper addresses the effect of fluid flow in the CT and in the CT/wellbore annulus on the state of force and stress in the CT, and thereby predicts its effect on the reach attainable by the CT. The flow of fluid through the CT and the annulus between the CT and the borehole modifies the pressures and the effective force that govern the mechanical stability of the CT. The net force per unit length caused by fluid flow in the CT and annulus between the CT and casing/well is calculated in terms of the shear stress, and its effect on the onset of buckling and lockup is determined. A model is then implemented in a full-tubing-forces calculation, and the effect of flowing fluids and producing fluids on reach is analyzed. The new model is used in desiging commercial jobs. The exact analytic model shows that fluid flow inside the CT has zero impact on reach, that downward flow in the annulus has a favorable impact, and that upward flow in the annulus reduces the maximum attainable reach. A CT job can be designed using the full-tubing-forces model, taking into account the flow of a fluid with a specified rheology, density, and flow rate. Thus, the feasibility of attaining a given reach can be more accurately determined. Results are presented in the form of the surface weight for commercial wells and are compared to field jobs.
引用
收藏
页码:59 / 63
页数:5
相关论文
共 50 条
  • [1] Vibration and rotation to extend coiled-tubing reach
    Bybee, Karen
    [J]. JPT, Journal of Petroleum Technology, 2007, 59 (06): : 80 - 81
  • [2] New downhole tool extends coiled-tubing reach
    [J]. 1600, Soc Pet Eng (SPE), Richardson, TX, United States (52):
  • [3] New downhole tool extends coiled-tubing reach
    不详
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 2000, 52 (06): : 32 - +
  • [4] Fluid-Hammer Effects on Coiled-Tubing Friction in Extended-Reach Wells
    Livescu, Silviu
    Craig, Steven
    Aitken, Bill
    [J]. SPE JOURNAL, 2017, 22 (01): : 365 - 373
  • [5] Coiled-tubing applications
    Rike, EA
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 2004, 56 (06): : 48 - 48
  • [6] Coiled-tubing applications
    [J]. 1600, Society of Petroleum Engineers (SPE) (70):
  • [7] Coiled-tubing window milling
    Hearn, DD
    Blount, CG
    Kamlowsky, PE
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1996, 48 (09): : 833 - 834
  • [8] Successes in coiled-tubing automation
    不详
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 2000, 52 (06): : 35 - 36
  • [9] Specific fluid requirements for successful coiled-tubing fracturing applications
    Cawiezel, Kay E.
    Wheeler, Richard S.
    Vaughn, David R.
    [J]. SPE PRODUCTION & OPERATIONS, 2007, 22 (01): : 83 - 93
  • [10] THE CHALLENGE FOR THE COILED-TUBING INDUSTRY
    BLOUNT, CG
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1994, 46 (05): : 427 - 430