A grasp for single machine scheduling with sequence dependent setup costs and linear delay penalties

被引:27
|
作者
Feo, TA
Sarathy, K
McGahan, J
机构
[1] Operations Research Group, Department of Mechanical Engineering, University of Texas at Austin, Austin
[2] Department of Mechanical Engineering, University of Texas, Austin, TX
关键词
D O I
10.1016/0305-0548(95)00084-4
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The single machine scheduling (SMS) problem with sequence dependent setup costs and linear delay penalties is readily found in industrial environments. The problem is of interest in manufacturing because any increase in the efficiency of a heavily utilized machine translates directly into cost savings. However, finding good solutions to this NP-hard combinatorial optimization problem has challenged researchers for years in industry and academia. A novel methodology, Greedy Randomized Adaptive Search Procedure (GRASP), is used in this paper to develop an efficient heuristic for the SMS problem. The empirical results of other researchers are used to validate the heuristic's performance. Previous exact approaches using dynamic programming (DP) with branch and bound provide optimal solutions to SMS instances with up to 20 jobs. A clever implementation of tabu search shows success for problems possessing up to 100 jobs. Our heuristic compares favorably to both the DP and tabu search methods with respect to the solution values obtained and the CPU times required. Copyright (C) 1996 Elsevier Science Ltd
引用
收藏
页码:881 / 895
页数:15
相关论文
共 50 条
  • [41] Single machine scheduling with batch-dependent setup times
    Mosheiov, G
    Oron, D
    INFORMATION PROCESSING LETTERS, 2006, 98 (02) : 73 - 78
  • [42] Single machine group scheduling with resource dependent setup times
    School of Mathematics and Systems Science, Shenyang Normal Univ., Shenyang 110034, China
    不详
    Xi Tong Cheng Yu Dian Zi Ji Shu/Syst Eng Electron, 2007, 6 (938-941):
  • [43] Parallel Machine Scheduling with Resources Constraint and Sequence Dependent Setup Times
    Hou, Zheng-liang
    Guo, Xiu-ping
    PROCEEDINGS OF 2012 3RD INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION (IEMI2012), 2013, : 801 - 811
  • [44] ECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP COSTS.
    Galvin, Thomas M.
    Production and inventory management Washington, D.C., 1987, 28 (01): : 96 - 105
  • [45] A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs
    Monkman, Susan K.
    Morrice, Douglas J.
    Bard, Jonathan F.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) : 1100 - 1114
  • [46] Single-machine scheduling with past-sequence-dependent setup times and effects of deterioration and learning
    Ji-Bo Wang
    Yong Jiang
    Gang Wang
    The International Journal of Advanced Manufacturing Technology, 2009, 41 : 1221 - 1226
  • [48] Single-machine scheduling against due dates with past-sequence-dependent setup times
    Biskup, Dirk
    Herrmann, Jan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 191 (02) : 586 - 591
  • [49] Single machine scheduling based on two types of periodic maintenance and sequence-dependent setup times
    Yang, Meng-Yue
    Dong, Wen-Jie
    Liu, Si-Feng
    Kongzhi yu Juece/Control and Decision, 2024, 39 (10): : 3488 - 3496
  • [50] The single machine scheduling problem with sequence-dependent setup times and a learning effect on processing times
    Mustu, Settar
    Eren, Tamer
    APPLIED SOFT COMPUTING, 2018, 71 : 291 - 306