A grasp for single machine scheduling with sequence dependent setup costs and linear delay penalties

被引:27
|
作者
Feo, TA
Sarathy, K
McGahan, J
机构
[1] Operations Research Group, Department of Mechanical Engineering, University of Texas at Austin, Austin
[2] Department of Mechanical Engineering, University of Texas, Austin, TX
关键词
D O I
10.1016/0305-0548(95)00084-4
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The single machine scheduling (SMS) problem with sequence dependent setup costs and linear delay penalties is readily found in industrial environments. The problem is of interest in manufacturing because any increase in the efficiency of a heavily utilized machine translates directly into cost savings. However, finding good solutions to this NP-hard combinatorial optimization problem has challenged researchers for years in industry and academia. A novel methodology, Greedy Randomized Adaptive Search Procedure (GRASP), is used in this paper to develop an efficient heuristic for the SMS problem. The empirical results of other researchers are used to validate the heuristic's performance. Previous exact approaches using dynamic programming (DP) with branch and bound provide optimal solutions to SMS instances with up to 20 jobs. A clever implementation of tabu search shows success for problems possessing up to 100 jobs. Our heuristic compares favorably to both the DP and tabu search methods with respect to the solution values obtained and the CPU times required. Copyright (C) 1996 Elsevier Science Ltd
引用
收藏
页码:881 / 895
页数:15
相关论文
共 50 条
  • [31] Single machine group scheduling with learning effects and past-sequence-dependent setup times
    Low, Chinyao
    Lin, Wen-Yi
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2012, 43 (01) : 1 - 8
  • [32] Single-machine scheduling with deteriorating jobs and past-sequence-dependent setup times
    Cheng, T. C. E.
    Lee, Wen-Chiung
    Wu, Chin-Chia
    APPLIED MATHEMATICAL MODELLING, 2011, 35 (04) : 1861 - 1867
  • [33] Neighborhood Combination Search for Single-Machine Scheduling with Sequence-Dependent Setup Time
    Liu, Xiao-Lu
    Xu, Hong-Yun
    Chen, Jia-Ming
    Su, Zhou-Xing
    Lyu, Zhi-Peng
    Ding, Jun-Wen
    JOURNAL OF COMPUTER SCIENCE AND TECHNOLOGY, 2024, 39 (03) : 737 - 752
  • [34] Applying Fuzzy Logic to Estimate Setup Times in Sequence Dependent Single Machine Scheduling Problems
    Bagherpour, Morteza
    Noghondarian, Kazem
    Noori, Siamak
    INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2007, 7 (01): : 111 - 118
  • [35] Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness
    Sun, Xiaoqing
    Noble, James S.
    Klein, Cerry M.
    IIE Transactions (Institute of Industrial Engineers), 1999, 31 (02): : 113 - 124
  • [36] Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness
    Sun, XQ
    Noble, JS
    Klein, CM
    IIE TRANSACTIONS, 1999, 31 (02) : 113 - 124
  • [37] A sequence dependent single machine scheduling problem with fuzzy axiomatic design for the penalty costs
    Kir, Sena
    Yazgan, Harun Resit
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 92 : 95 - 104
  • [38] The time-dependent traveling salesman problem and single machine scheduling problems with sequence dependent setup times
    Bigras, Louis-Philippe
    Gamache, Michel
    Savard, Gilles
    DISCRETE OPTIMIZATION, 2008, 5 (04) : 685 - 699
  • [39] A heuristic approach to batching and scheduling a single machine to minimize setup costs
    Agnetis, A
    Alfieri, A
    Nicosia, G
    COMPUTERS & INDUSTRIAL ENGINEERING, 2004, 46 (04) : 793 - 802
  • [40] Single machine group scheduling with resources dependent setup time
    School of Mathematics and Systems Science, Shenyang Normal University, Shenyang 110034, China
    Dianji yu Kongzhi Xuebao, 2007, 1 (70-73+78):