共 50 条
- [41] Comprehensive Pricing Model of Urban Traffic Air Pollution based on Bi-Level Programming [J]. SUSTAINABLE DEVELOPMENT OF URBAN INFRASTRUCTURE, PTS 1-3, 2013, 253-255 : 1913 - 1917
- [42] A Royalty Negotiation Model for BOT Projects: A Bi-level Programming Approach [J]. IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 1764 - +
- [46] A Bi-level model of response-time coordination plan in supply chain [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 850 - 854
- [47] A Solution to Interval Linear Bi-level Programming and Its Application in Decentralized Supply Chain Planning [J]. IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2, 2008, : 2035 - 2038
- [49] Time-Cost Trade-off Problem in Construction Supply Chain: A Bi-level Programming Decision Model [J]. 2010 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (ICMSE), 2010, : 212 - 217
- [50] A Bi-level Programming Decision Model for Time-Cost Trade-off Problem in Construction Supply Chain [J]. ICOSCM 2009 - PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON OPERATIONS AND SUPPLY CHAIN MANAGEMENT, 2009, 3 : 354 - 359