共 50 条
- [31] Metaheuristics for Solving a Hybrid Flexible Flowshop Problem with Sequence-Dependent Setup Times [J]. SWARM INTELLIGENCE BASED OPTIMIZATION (ICSIBO 2014), 2014, 8472 : 9 - 25
- [32] Solving a multi-objective job shop scheduling problem with sequence-dependent setup times by a Pareto archive PSO combined with genetic operators and VNS [J]. The International Journal of Advanced Manufacturing Technology, 2011, 53 : 733 - 750
- [33] Solving a multi-objective job shop scheduling problem with sequence-dependent setup times by a Pareto archive PSO combined with genetic operators and VNS [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 53 (5-8): : 733 - 750
- [35] A hybrid simulated annealing for the single-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times and costs and dynamic release of jobs [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 54 (9-12): : 1109 - 1119
- [36] A hybrid simulated annealing for the single-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times and costs and dynamic release of jobs [J]. The International Journal of Advanced Manufacturing Technology, 2011, 54 : 1109 - 1119
- [39] A single-machine bicriterion scheduling problem with setup times [J]. JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2005, 8 (03): : 559 - 568