Optimization-based available-to-promise with multi-stage resource availability

被引:56
|
作者
Zhao, ZY [1 ]
Ball, MO
Kotake, M
机构
[1] Univ Maryland, Robert H Smith Sch Business, College Pk, MD 20742 USA
[2] Univ Maryland, Syst Res Inst, College Pk, MD 20742 USA
[3] Toshiba Co Ltd, Corp Mfg Engn Ctr, Isogo Ku, Yokohama, Kanagawa 2350017, Japan
基金
美国国家科学基金会;
关键词
available-to-promise; manufacturing order; production capability; order-promising and fulfillment; mixed-integer-programming;
D O I
10.1007/s10479-005-6235-7
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Increasingly, customer service, rapid response to customer requirements, and flexibility to handle uncertainties in both demand and supply are becoming strategic differentiators in the marketplace. Organizations that want to achieve these benchmarks require sophisticated approaches to conduct order promising and fulfillment, especially in todays high-mix low-volume production environment. Motivated by these challenges, the Available-to-Promise (ATP) function has migrated from a set of availability records in a Master Production Schedule (MPS) toward an advanced real-time decision support system to enhance decision responsiveness and quality in Assembly To Order (ATO) or Configuration To Order (CTO) environments. Advanced ATP models and systems must directly link customer orders with various forms of available resources, including both material and production capacity. In this paper, we describe a set of enhancements carried out to adapt previously published mixed-integer-programming (MIP) models to the specific requirements posed by an electronic product supply chain within Toshiba Corporation. This model can provide individual order delivery quantities and due dates, together with production schedules, for a batch of customer orders that arrive within a predefined batching interval. The model considers multi-resource availability including manufacturing orders, production capability and production capacity. In addition, the model also takes into account a variety of realistic order promising issues such as order splitting, model decomposition and resource expediting and de-expediting. We conclude this paper with comparison of our model execution results vs. actual historical performance of systems currently in place.
引用
收藏
页码:65 / 85
页数:21
相关论文
共 50 条
  • [1] Optimization-Based Available-To-Promise with Multi-Stage Resource Availability
    Zhenying Zhao
    Michael O. Ball
    Masahiro Kotake
    Annals of Operations Research, 2005, 135 : 65 - 85
  • [2] Available-to-promise Model for a Multi-site Supply Chain
    Yang, Wen
    Fung, Richard Y. K.
    2012 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS (ICAL), 2012, : 73 - 78
  • [3] An available-to-promise stochastic model for order promising based on dynamic resource reservation policy
    Qin, Wei
    Zhuang, Zilong
    Sun, Yanning
    Liu, Yang
    Yang, Miying
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (16) : 5525 - 5542
  • [4] Optimization-based Allocated-Available-to-Promise for Quick Response
    Yang, Lixi
    Li, Shiqi
    Huang, Xiabao
    ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 417 - 421
  • [5] WebATP: a Web-based flexible available-to-promise computation system
    Xiong, MH
    Tor, SB
    Khoo, LP
    PRODUCTION PLANNING & CONTROL, 2003, 14 (07) : 662 - 672
  • [6] Optimization-based technoeconomic comparison of multi-stage membrane distillation configurations for hypersaline produced water desalination
    Shamlou, Elmira
    Vidic, Radisav
    Khanna, Vikas
    DESALINATION, 2022, 543
  • [7] Available-to-promise based bidding decision by fuzzy mathematical programming and genetic algorithm
    Cheng, Chi-Bin
    Cheng, Chao-Jung
    COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (04) : 993 - 1002
  • [8] Multi-Stage Optimization-Based Automatic Voltage Control Systems Considering Wind Power Forecasting Errors
    Qin, Nan
    Bak, Claus Leth
    Abildgaard, Hans
    Chen, Zhe
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2017, 32 (02) : 1073 - 1088
  • [9] A web-enhanced dynamic BOM-based available-to-promise system
    Xiong, MH
    Tor, SB
    Khoo, LP
    Chen, CH
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 84 (02) : 133 - 147
  • [10] Optimization of multi-stage pyrolysis
    Oyedun, Adetoyese Olajire
    Lam, Ka Leung
    Gebreegziabher, Tesfaldet
    Hui, Chi Wai
    APPLIED THERMAL ENGINEERING, 2013, 61 (01) : 123 - 127