Desman: A dynamic model for managing civil engineering design projects

被引:19
|
作者
Ogunlana, S [1 ]
Lim, J [1 ]
Saeed, K [1 ]
机构
[1] Asian Inst Technol, Sch Civil Engn, Bangkok 10501, Thailand
关键词
D O I
10.1016/S0045-7949(97)00148-X
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Traditional project management tools are useful in managing design projects. However, incorporating "soft data" into tools like the critical part method (CPM) and bar charts is problematic. They are also best used for bottoms to top management and are, therefore, not very effective for macro managing projects. A system dynamic model can improve the current practices and reduce the problems in design projects when used as a tool for macro management. A model was developed for the management of detailed design process of a civil engineering project. The model consists of four interrelated subsystems: human resources, design production, controlling and planning. Two sets of data were used to test the model. Some policies and scenarios were then explored to gain insight into the model's behaviour and to seek alternatives for better management. The experimentation showed the following policy hierarchy. In terms of meeting scheduled time, the effectiveness of policies is in the order: (1) progress control, (2) manpower allocation, (3) estimation of workload and (4) realization of underestimated work. If the goal is to minimize labour-days expended or to reduce the cost of design, the effectiveness of policies is in the order: (1) manpower allocation, (2) progress control, (3) estimation of workload and (4) realization of underestimated work. As such, good project control and early perception of real progress are needed to ensure efficient resource allocation and on-time completion. This requires creation of a project organization which is able to recognize and process changing information on those issues. (C) 1998 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:401 / 419
页数:19
相关论文
共 50 条
  • [31] Geotechnical risks on large civil engineering projects
    Hoek, E
    Palmieri, A
    EIGHTH INTERNATIONAL CONGRESS INTERNATIONAL ASSOCIATION FOR ENGINEERING GEOLOGY AND THE ENVIRONMENT, PROCEEDINGS, VOLS 1-5, 1998, : 79 - 88
  • [32] CIVIL ENGINEERING AND CONSTRUCTION WORK FOR NUCLEAR PROJECTS
    不详
    NUCLEAR ENGINEERING INTERNATIONAL, 1972, 17 (196): : 715 - &
  • [33] ENERGY USE IN CIVIL ENGINEERING PROJECTS.
    Varley, J.S.
    Applied Scientific Research (The Hague), 1979, : 15 - 27
  • [34] Important Civil Engineering Projects in India.
    Alimchandani, C.R.
    Annales de l'Institut technique du batiment et des travaux publics, 1986, 39 (450): : 65 - 87
  • [35] TOPICALITY AND USING OF CIVIL ENGINEERING PROJECTS VISUALIZATION
    Danaitis, Konstantinas Stanislovas
    Usovaite, Ana
    MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES, 10TH INTERNATIONAL CONFERENCE 2010, VOL I, 2010, : 386 - 390
  • [36] RAILWAY ELECTRIFICATION - ANGLIA CIVIL ENGINEERING PROJECTS
    LEWIS, WM
    CLARK, PJ
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1987, 82 : 247 - 268
  • [37] Managing the business (and engineering) of environmental remediation projects
    Ferries, Mark R.
    Tyrrell, Ken
    Pipeline and Gas Journal, 2005, 232 (10): : 38 - 42
  • [38] Successfully managing fast track engineering projects
    Phillips, BP
    PIONEERING NEW TECHNOLOGIES: MANAGEMENT ISSUES AND CHALLENGES IN THE THIRD MILLENNIUM, PROCEEDINGS, 1998, : 166 - 172
  • [40] Managing high-tech engineering projects
    Dwyer, Martin
    Engineers Australia, 2004, 76 (02):