A Hybrid Approach Using CLP and MILP Applied to Tank Farm Operation Scheduling

被引:0
|
作者
Stebel, S. L. [1 ]
Neves, F., Jr. [1 ]
Arruda, L. V. R. [1 ]
机构
[1] CPGEI, UTFPR, BR-80230901 Curitiba, Parana, Brazil
关键词
Scheduling; Constraint Logic Programming (CLP); Mixed Integer Linear Programming (MILP); Tank Farm; Fuzzy Systems;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
This work develops an optimization model to aid the operational decision-making in a real world tank farm scheduling. The short term scheduling of tank farm is a hard task because the specialist has to take into account issues concerning plant topology, mass balances, transfer policies, resource constraints, demand pattern, and changeovers. So this operational decision-making is still based on experience with the aid of manual computations. The main goal of this work is to reduce the difference between a theoretical model and the practical needs. In order to reduce this difference the formulation addresses a new aspect related to the operator procedure. When the operator executes the programmed activities many tasks are delayed or advanced for personal convenience. This fact can cause bottlenecks in the system operation. In order to avoid them, some considerations about qualitative variables are inserted in the model. So that, the generated scheduling tends to be more practical to represent the qualitative variables by means a fuzzy system. Moreover the scheduling problem is modeled in a unified framework, which uses Constraint Logic Programming (CLP) and Mixed Integer Linear Programming (MILP). This approach had a computational time smaller than only the MILP model, and is able to define a good solution in few seconds. The proposed model can be used to test and correct new operational conditions and scenarios rather than to just determine the scheduling of regular activities.
引用
收藏
页码:2213 / 2218
页数:6
相关论文
共 50 条
  • [41] Due windows group scheduling using an effective hybrid optimization approach
    Behnamian, J.
    Zandieh, M.
    Ghomi, S. M. T. Fatemi
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 46 (5-8): : 721 - 735
  • [42] Workflow Scheduling in Grid Computing Environment using a Hybrid GAACO Approach
    Sathish K.
    RamaMohan Reddy A.
    Sathish, Kuppani (ksathishphdsvu@gmail.com), 1600, Springer (98): : 121 - 128
  • [43] Scheduling Jobs in Computational Grid using Hybrid ACS and GA Approach
    Alobaedy, Mustafa Muwafak
    Ku-Mahamud, Ku Ruhana
    2014 IEEE COMPUTING, COMMUNICATIONS AND IT APPLICATIONS CONFERENCE (COMCOMAP), 2014, : 223 - 228
  • [44] Cost-effective task scheduling using hybrid approach in cloud
    Thaman J.
    Singh M.
    Thaman, Jyoti (jyoti.thaman77@gmail.com), 1600, Inderscience Publishers, 29, route de Pre-Bois, Case Postale 856, CH-1215 Geneva 15, CH-1215, Switzerland (08): : 241 - 253
  • [45] Routing and scheduling on evacuation path networks using centralized hybrid approach
    Osman, Mojahid Saeed
    Ram, Bala
    COMPUTERS & OPERATIONS RESEARCH, 2017, 88 : 332 - 339
  • [46] Reliability based generator maintenance scheduling using hybrid evolutionary approach
    Reihani, Ehsan
    Sarikhani, Ali
    Davodi, Moez
    Davodi, Mehdi
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2012, 42 (01) : 434 - 439
  • [47] Time periodic optimal policy for operation of a water storage tank using the dynamic programming approach
    Unami, Koichi
    Mohawesh, Osama
    Fadhil, Rasha M.
    APPLIED MATHEMATICS AND COMPUTATION, 2019, 353 : 418 - 431
  • [48] Optimal operation scheduling of a microgrid using a novel scenario-based robust approach
    Shen, Zhangyi
    Wu, Linli
    Sedgh, Seyed Amin
    Radmehr, Fereydun
    ENGINEERING OPTIMIZATION, 2024, 56 (03) : 338 - 359
  • [49] Hybrid methods using genetic algorithm approach for crude distillation unit scheduling
    Dave, D
    Zhang, N
    PROCESS SYSTEMS ENGINEERING 2003, PTS A AND B, 2003, 15 : 445 - 450
  • [50] THERMAL GENERATOR SCHEDULING USING HYBRID GENETIC SIMULATED-ANNEALING APPROACH
    WONG, KP
    WONG, YW
    IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 1995, 142 (04) : 372 - 380