Scheduling Jobs in Computational Grid using Hybrid ACS and GA Approach

被引:0
|
作者
Alobaedy, Mustafa Muwafak [1 ]
Ku-Mahamud, Ku Ruhana [1 ]
机构
[1] Univ Utara Malaysia, Coll Art & Sci, Sch Comp, Sintok 06010, Kedah, Malaysia
关键词
job scheduling; hybrid Ant Colony System; Genetic Algorithm; static grid computing; METAHEURISTICS;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Metaheuristics algorithms show very good performance in solving various job scheduling problems in computational grid systems. However, due to the complexity and heterogeneous nature of resources in grid computing, stand-alone algorithm is not capable to find a good quality solution in reasonable time. This study proposes a hybrid algorithm, specifically ant colony system and genetic algorithm to solve the job scheduling problem. The high level hybridization algorithm will keep the identity of each algorithm in performing the scheduling task. The study focuses on static grid computing environment and the metrics for optimization are the makespan and flowtime. Experiment results show that the proposed algorithm outperforms other stand-alone algorithms such as ant system, genetic algorithms, and ant colony system for makespan. However, for flowtime, ant system and genetic algorithm perform better.
引用
收藏
页码:223 / 228
页数:6
相关论文
共 50 条
  • [1] Scheduling jobs on computational grid using Differential Evolution algorithm
    Selvi, S.
    Manimegalai, D.
    [J]. RECENT ADVANCES IN NETWORKING, VLSI AND SIGNAL PROCESSING, 2010, : 118 - +
  • [2] Using moldability to improve scheduling performance of parallel jobs on computational grid
    Huang, Kuo-Chan
    Shih, Po-Chi
    Chung, Yeh-Ching
    [J]. ADVANCES IN GRID AND PERVASIVE COMPUTING, PROCEEDINGS, 2008, 5036 : 116 - +
  • [3] An online scheduling algorithm for assigning jobs in the computational grid
    Weng, CL
    Li, ML
    Lu, XD
    [J]. IEICE TRANSACTIONS ON INFORMATION AND SYSTEMS, 2006, E89D (02) : 597 - 604
  • [4] A Computational Grid Scheduling Model to Maximize Reliability Using Modified GA
    Raza, Zahid
    Vidyarthi, Deo Prakash
    [J]. INTERNATIONAL JOURNAL OF GRID AND HIGH PERFORMANCE COMPUTING, 2011, 3 (01) : 1 - 20
  • [5] A GA Based Job Scheduling Strategy for Computational Grid
    Singh, Krishan Veer
    Raza, Zahid
    [J]. 2015 INTERNATIONAL CONFERENCE ON ADVANCES IN COMPUTER ENGINEERING AND APPLICATIONS (ICACEA), 2015, : 29 - 34
  • [6] Dual objective security driven scheduling model for computational grid using GA
    Kashyap, R.
    Vidyarthi, D.P.
    [J]. IAENG International Journal of Computer Science, 2012, 39 (01) : 71 - 79
  • [7] EACS Approach for Grid Workflow Scheduling in a Computational Grid
    Kumar, E. Saravana
    Sumathi, A.
    [J]. COMPUTATIONAL INTELLIGENCE AND INFORMATION TECHNOLOGY, 2011, 250 : 276 - +
  • [8] Observations on Effect of IPC in GA Based Scheduling on Computational Grid
    Prakash, Shiv
    Vidyarthi, Deo Prakash
    [J]. INTERNATIONAL JOURNAL OF GRID AND HIGH PERFORMANCE COMPUTING, 2012, 4 (01) : 67 - 80
  • [9] Tasks Scheduling in Computational Grid using a Hybrid Discrete Particle Swarm Optimization
    Karimi, Maryam
    Motameni, Homayoon
    [J]. INTERNATIONAL JOURNAL OF GRID AND DISTRIBUTED COMPUTING, 2013, 6 (02): : 29 - 38
  • [10] Scheduling Jobs on Grid Processors
    Boyar, Joan
    Favrholdt, Lene M.
    [J]. ALGORITHMICA, 2010, 57 (04) : 819 - 847