Optimal length of lease period and maintenance policy for leased equipment with a control-limit on age

被引:21
|
作者
Yeh, Ruey Huei [2 ]
Chang, Wen Liang [1 ]
Lo, Hui-Chiung [3 ]
机构
[1] Cardinal Tien Coll Healthcare & Management, Dept Informat Management, Taipei, Taiwan
[2] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei, Taiwan
[3] Tamkang Univ, Dept Business Adm, Taipei, Taiwan
关键词
Preventive maintenance; Length of lease period; Discount; Control-limit; Residual value; OPTIMAL PREVENTIVE-MAINTENANCE; REPLACEMENT POLICIES; SHOCK MODEL;
D O I
10.1016/j.mcm.2011.05.009
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper investigates the optimal length of lease period and maintenance policy for leased equipment. In order to have steady revenue, the lessor (owner) of equipment may provide a discount to encourage the lessee (user) to sign a contract with a longer lease period. However, as the lease period increases, the maintenance cost also increases due to the deterioration or usage of the equipment. Therefore, there is a need to determine an appropriate length of lease period and a corresponding maintenance policy for the leased equipment from the viewpoint of the lessor such that the expected total profit is maximized. In this paper, the following maintenance scheme is considered. When the leased equipment fails, a minimal repair is conducted to bring the equipment back to an operating condition. Furthermore, when the age of the equipment reaches a specified level (called as a control-limit), an imperfect preventive maintenance (PM) is carried out to avoid possible failures. Under this maintenance scheme, the mathematical model of the expected total profit is developed and the optimal length of lease period and the corresponding optimal maintenance policy are derived. Finally, some numerical examples are given to illustrate the effects of the length of lease period and the maintenance policy on the expected total profit. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2014 / 2019
页数:6
相关论文
共 50 条
  • [41] SUFFICIENT OPTIMALITY CONDITIONS FOR CONTROL-LIMIT POLICY IN A SEMI-MARKOV PROCESS
    GERTSBACH, I
    JOURNAL OF APPLIED PROBABILITY, 1976, 13 (02) : 400 - 406
  • [42] Optimal preventive maintenance strategy for leased equipment under successive usage-based contracts
    Wang, Xiaolin
    Li, Lishuai
    Xie, Min
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (18) : 5705 - 5724
  • [43] Optimal Maintenance Policy for Equipment Submitted to Multi-Period Leasing as a Circular Business Model
    Ben Mabrouk, Amel
    Chelbi, Anis
    Aguir, Mohamed Salah
    Dellagi, Sofiene
    SUSTAINABILITY, 2024, 16 (12)
  • [44] SUFFICIENT OPTIMALITY CONDITIONS FOR CONTROL-LIMIT POLICY IN A SEMI-MARKOV PROCESS.
    Gertsbach, I.
    1976, 13 (02): : 400 - 406
  • [45] Optimal sequential PM policy for leased equipment: Negligible and non-negligible repair time
    Sungkharit, W.
    Pongpech, J.
    IMECS 2006: INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, 2006, : 636 - +
  • [46] AN OPTIMAL IMPERFECT MAINTENANCE POLICY OVER A WARRANTY PERIOD
    JACK, N
    DAGPUNAR, JS
    MICROELECTRONICS AND RELIABILITY, 1994, 34 (03): : 529 - 534
  • [47] Optimal Number of Fleet Maintenance Contract with Policy Limit Cost
    Husniah, Hennie
    Pasaribu, Udjianna S.
    Supriatna, Asep K.
    Iskandar, Bermawi P.
    2017 4TH INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2017, : 876 - 880
  • [48] Policy for equipment's leasing period extension with minimum cost of maintenance
    Lestari, C.
    Kurniati, N.
    INTERNATIONAL CONFERENCE ON INDUSTRIAL AND SYSTEMS ENGINEERING (ICONISE) 2017, 2018, 337
  • [49] OPTIMAL AGE-POLICY WITH IMPERFECT PREVENTIVE MAINTENANCE
    MURTHY, DNP
    NGUYEN, DG
    IEEE TRANSACTIONS ON RELIABILITY, 1981, 30 (01) : 80 - 81