Optimal length of lease period and maintenance policy for leased equipment with a control-limit on age

被引:21
|
作者
Yeh, Ruey Huei [2 ]
Chang, Wen Liang [1 ]
Lo, Hui-Chiung [3 ]
机构
[1] Cardinal Tien Coll Healthcare & Management, Dept Informat Management, Taipei, Taiwan
[2] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei, Taiwan
[3] Tamkang Univ, Dept Business Adm, Taipei, Taiwan
关键词
Preventive maintenance; Length of lease period; Discount; Control-limit; Residual value; OPTIMAL PREVENTIVE-MAINTENANCE; REPLACEMENT POLICIES; SHOCK MODEL;
D O I
10.1016/j.mcm.2011.05.009
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper investigates the optimal length of lease period and maintenance policy for leased equipment. In order to have steady revenue, the lessor (owner) of equipment may provide a discount to encourage the lessee (user) to sign a contract with a longer lease period. However, as the lease period increases, the maintenance cost also increases due to the deterioration or usage of the equipment. Therefore, there is a need to determine an appropriate length of lease period and a corresponding maintenance policy for the leased equipment from the viewpoint of the lessor such that the expected total profit is maximized. In this paper, the following maintenance scheme is considered. When the leased equipment fails, a minimal repair is conducted to bring the equipment back to an operating condition. Furthermore, when the age of the equipment reaches a specified level (called as a control-limit), an imperfect preventive maintenance (PM) is carried out to avoid possible failures. Under this maintenance scheme, the mathematical model of the expected total profit is developed and the optimal length of lease period and the corresponding optimal maintenance policy are derived. Finally, some numerical examples are given to illustrate the effects of the length of lease period and the maintenance policy on the expected total profit. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2014 / 2019
页数:6
相关论文
共 50 条
  • [31] Optimal threshold values of age and two-phase maintenance policy for leased equipments using age reduction method
    Ruey Huei Yeh
    Wen Liang Chang
    Hui-Chiung Lo
    Annals of Operations Research, 2010, 181 : 171 - 183
  • [32] OPTIMAL CONTROL-LIMIT POLICIES FOR A ZERO-MEMORY REPLACEMENT PROBLEM
    WHITE, CC
    INFORMATION AND CONTROL, 1978, 37 (01): : 90 - 99
  • [33] Equilibrium probabilities for a production-inventory system maintained by a control-limit policy
    Kyriakidis, E. G.
    COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2016, 45 (01) : 194 - 200
  • [34] Condition-based maintenance policy for shared service-oriented leased equipment
    Ruan, Yuanpeng
    Yu, Jinlong
    Luo, Xinggang
    Huang, Wenpo
    Ding, Xianghai
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 198
  • [35] AN ELECTRICITY PRICE-DEPENDENT CONTROL-LIMIT POLICY FOR CONDITION-BASED MAINTENANCE OPTIMIZATION FOR POWER GENERATING UNIT
    Qian, Xinbo
    Wu, Yonggang
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2016, 18 (02): : 245 - 253
  • [36] Lessees' satisfaction and optimal condition-based maintenance policy for leased system
    Zhang, Yunzheng
    Zhang, Xiaohong
    Zeng, Jianchao
    Wang, Jinhe
    Xue, Songdong
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2019, 191
  • [37] Control-limit preventive maintenance policies for components subject to imperfect preventive maintenance and variable operational conditions
    You, Ming-Yi
    Li, Hongguang
    Meng, Guang
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2011, 96 (05) : 590 - 598
  • [38] Reliability-based maintenance optimization for the leased equipment with deterioration depending on age and usage
    Shang, Lijun
    Si, Shubin
    Cai, Zhiqiang
    Wang, Xianzhi
    SAFETY AND RELIABILITY - SAFE SOCIETIES IN A CHANGING WORLD, 2018, : 653 - 661
  • [39] Optimal length of financial lease contract for new-tech equipment refresh
    Bao, JH
    Fang, SJ
    Proceedings of the 2005 International Conference on Management Science & Engineering (12th), Vols 1- 3, 2005, : 658 - 661