An approach to integrate production-transportation planning and scheduling in an aluminium supply chain network

被引:29
|
作者
Steinruecke, Martin [1 ]
机构
[1] Ernst Moritz Arndt Univ Greifswald, Fac Law & Econ, D-17489 Greifswald, Germany
关键词
supply chain network; distribution; scheduling; mixed-integer programming; relax-and-fix heuristic; PROGRAMMING MODEL; OPTIMIZATION;
D O I
10.1080/00207543.2010.528461
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article is based on a real-life problem of a global aluminium supply chain network driven by an aluminium smelter. At each echelon of the aluminium supply chain network, several members are involved which are scattered around the world. Producing aluminium begins with bauxite mining. Next, aluminium oxide is made from bauxite and finally aluminium is produced from aluminium oxide. A novel type of mixed-integer decision-making model, including a time-continuous representation of the planning period, is presented. The model enables coordination of production quantities and times of all supply chain members in order to minimise production and transportation costs of the whole supply chain minus bonus payments for early deliveries which are stipulated between the supply chain network and its customers. Material flows can take place with or without temporary storage of intermediate products at supplying and/or receiving sites. Furthermore, relax-and-fix heuristics are presented. A number of randomly generated scenarios are presented to demonstrate that the heuristics can find nearly optimal solutions along with drastically reduced computation times. The relax-and-fix heuristic enables iterative planning between centralised and decentralised decision makers.
引用
收藏
页码:6559 / 6583
页数:25
相关论文
共 50 条