Heuristic algorithms for production and transportation planning through synchronization of a serial supply chain

被引:4
|
作者
Jung, Jung Woo [1 ]
Lee, Young Hae [1 ]
机构
[1] Hanyang Univ, Dept Ind & Management Engn, Ansan 426791, Gyeonggi Do, South Korea
关键词
Synchronization; No-wait approach; Supply chain; Heuristic algorithms; INVENTORY MODEL; POLICY;
D O I
10.1016/j.ijpe.2009.12.006
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study suggests an approach that synchronizes timing points found between a supplier and a buyer in a serial supply chain with one in two timing points to allow for more efficient and agile material flow. This approach is applied to the problem of finding an optimal solution for the production quantity in each production lot and the job sequence with minimum supply chain total cost and lead time. Five heuristic algorithms were developed based on simulated annealing (SA) and a genetic algorithm (GA). Of the developed heuristic algorithms, GA2 exhibited the most robustness. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:433 / 447
页数:15
相关论文
共 50 条
  • [1] A heuristic relief transportation planning algorithm for emergency supply chain management
    Chern, C. C.
    Chen, Y. L.
    Kung, L. C.
    [J]. INTERNATIONAL JOURNAL OF COMPUTER MATHEMATICS, 2010, 87 (07) : 1638 - 1664
  • [2] A hybrid heuristic approach for production planning in supply chain networks
    Kim, Daecheol
    Shin, Hyun Joon
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 78 (1-4): : 395 - 406
  • [3] A hybrid heuristic approach for production planning in supply chain networks
    Daecheol Kim
    Hyun Joon Shin
    [J]. The International Journal of Advanced Manufacturing Technology, 2015, 78 : 395 - 406
  • [4] A heuristic algorithm for a supply chain's production-distribution planning
    Camacho-Vallejo, Jose-Fernando
    Munoz-Sanchez, Rafael
    Luis Gonzalez-Velarde, Jose
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2015, 61 : 110 - 121
  • [5] A Solution for Transportation Planning in Supply Chain
    Modares, A.
    Sepehri, M.
    [J]. SCIENTIA IRANICA TRANSACTION E-INDUSTRIAL ENGINEERING, 2009, 16 (02): : 149 - 158
  • [6] A Lagrangean heuristic for integrated production and transportation planning problems in a dynamic, multi-item, two-layer supply chain
    Eksioglu, Sandra Duni
    Eksioglu, Burak
    Romeijn, H. Edwin
    [J]. IIE TRANSACTIONS, 2007, 39 (02) : 191 - 201
  • [7] Applying fuzzy goal programming to production/transportation planning decisions in a supply chain
    Liang, Tien-Fu
    [J]. INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2007, 38 (04) : 293 - 304
  • [8] A review analysis of models and algorithms for the optimization of supply chain planning, production and distribution
    Guzman, E.
    Poler, R.
    Andres, B.
    [J]. DIRECCION Y ORGANIZACION, 2020, 70 : 28 - 52
  • [9] PLANNING OF A SERIAL PRODUCTION BY MEANS OF GENETIC ALGORITHMS
    Crljenko, Domagoj
    Blazevic, Dalibor
    Mikac, Tonci
    [J]. ENGINEERING REVIEW, 2007, 27 (01) : 27 - 37
  • [10] An approach to integrate production-transportation planning and scheduling in an aluminium supply chain network
    Steinruecke, Martin
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (21) : 6559 - 6583