Two-stage hybrid flow shop with precedence constraints and parallel machines at second stage

被引:18
|
作者
Carpov, Sergiu [1 ,2 ]
Carlier, Jacques [2 ]
Nace, Dritan [2 ]
Sirdey, Renaud [1 ]
机构
[1] CEA, LIST, Embedded Real Time Syst Lab, F-91191 Gif Sur Yvette, France
[2] Univ Technol Compiegne, UMR CNRS Heudiasyc 6599, Ctr Rech Royallieu, F-60205 Compiegne, France
关键词
Hybrid flow shop; Precedence relations; Randomized list scheduling; Multiprocessor scheduling; SCHEDULING PROBLEMS; STAGE;
D O I
10.1016/j.cor.2011.05.020
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This study deals with the two-stage hybrid flow shop (HFS) problem with precedence constraints. Two versions are examined, the classical HFS where idle time between the operations of the same job is allowed and the no-wait HFS where idle time is not permitted. For solving these problems an adaptive randomized list scheduling heuristic is proposed. Two global bounds are also introduced so as to conservatively estimate the distance to optimality of the proposed heuristic. The evaluation is done on a set of randomly generated instances. The heuristic solutions for the classical HFS in average are provably situated below 2% from the optimal ones, and on the other hand, in the case of the no-wait HFS the average deviation is below 5%. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:736 / 745
页数:10
相关论文
共 50 条
  • [21] Heuristics for scheduling a two-stage hybrid flow shop with parallel batching machines: application at a hospital sterilisation plant
    Rossi, Andrea
    Puppato, Alessio
    Lanzetta, Michele
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (08) : 2363 - 2376
  • [22] Two-stage flow-shop scheduling problem with non-identical second stage assembly machines
    J. Navaei
    S. M. T. Fatemi Ghomi
    F. Jolai
    M. E. Shiraqai
    H. Hidaji
    The International Journal of Advanced Manufacturing Technology, 2013, 69 : 2215 - 2226
  • [23] Two-stage flow-shop scheduling problem with non-identical second stage assembly machines
    Navaei, J.
    Ghomi, S. M. T. Fatemi
    Jolai, F.
    Shiraqai, M. E.
    Hidaji, H.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 69 (9-12): : 2215 - 2226
  • [24] Minimizing total completion time in two-stage hybrid flow shop with dedicated machines
    Yang, Jaehwan
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (07) : 1045 - 1053
  • [25] A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines
    Yi Tan
    Lars Mönch
    John W. Fowler
    Journal of Scheduling, 2018, 21 : 209 - 226
  • [26] A case study in a two-stage hybrid flow shop with setup time and dedicated machines
    Lin, HT
    Liao, CJ
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 86 (02) : 133 - 143
  • [27] Distributed two-stage hybrid flow shop scheduling
    Zhang Q.
    Sun Z.
    Lei D.
    Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2020, 48 (04): : 127 - 132
  • [28] Optimal scheduling of a two-stage hybrid flow shop
    Haouari, Mohamed
    Hidri, Lotfi
    Gharbi, Anis
    MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2006, 64 (01) : 107 - 124
  • [29] A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines
    Tan, Yi
    Moench, Lars
    Fowler, John W.
    JOURNAL OF SCHEDULING, 2018, 21 (02) : 209 - 226
  • [30] Optimal Scheduling of a Two-stage Hybrid Flow Shop
    Mohamed Haouari
    Lotfi Hidri
    Anis Gharbi
    Mathematical Methods of Operations Research, 2006, 64 : 107 - 124