Integrated Design Process for Modular Construction Projects to Reduce Rework

被引:21
|
作者
Hyun, Hosang [1 ]
Kim, Hyunsoo [2 ]
Lee, Hyun-Soo [3 ]
Park, Moonseo [3 ]
Lee, Jeonghoon [4 ]
机构
[1] Seoul Natl Univ, Inst Engn Res, Gwanak Ro 1, Seoul 08826, South Korea
[2] Dankook Univ, Dept Architectural Engn, 152 Jukjeon Ro, Yongin 16890, Gyeonggi Do, South Korea
[3] Seoul Natl Univ, Dept Architecture & Architectural Engn, Gwanak Ro 1, Seoul 08826, South Korea
[4] Construct Engn Policy Inst Korea, Tech Policy Res Team, Eonju Ro 650, Seoul 06098, South Korea
关键词
modular construction; rework; integrated design process; dependency structure matrix (DSM); process optimization; ON-SITE; CONSTRAINTS; SELECTION; DEFECTS; SYSTEM;
D O I
10.3390/su12020530
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In modular construction projects, unit production and onsite work are conducted concurrently, enabling shorter duration, lower cost, and improved quality. Because of the nature of the work, building design details should be determined early in the design phase, which requires information from participants. However, the design process for stick-built construction does not include such information, which leads to errors in design, such as omissions and conflicts of information from participants, causing reworking in the design phase. To reduce errors, an information flow should be identified representing when/what/how the information should be shared, and with whom. This paper proposes an integrated design process based on the information flow. To identify the flow, a precedence relationship between activities is represented using a dependency structure matrix (DSM). Then, the order of activities is rearranged using a partitioning algorithm. In this manner, unnecessary feedback and reverse information flow, which are related to errors, are reduced. Finally, the rearranged activities are proposed as an integrated design process. To validate the impact of the proposed process and methodology, interviews with experts were conducted. The validation results suggest that the project delivery method should also be considered in the early project phase in practical application.
引用
收藏
页数:19
相关论文
共 50 条
  • [41] Towards contracting strategy usage for rework in construction projects: a comprehensive review
    Asadi, Ramin
    Wilkinson, Suzanne
    Rotimi, James Olabode Bamidele
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2021, 39 (12) : 953 - 971
  • [42] Impact of construction-related rework on selected Ugandan public projects
    Kakitahi, John Muhumuza
    Alinaitwe, Henry Mwanaki
    Landin, Anne
    Mone, Simon James
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2016, 14 (02) : 238 - 251
  • [43] A Novel Method of Developing Construction Projects Schedule under Rework Scenarios
    Ma, Guofeng
    Jiang, Shan
    Zhu, Tiancheng
    Jia, Jianyao
    SUSTAINABILITY, 2019, 11 (20)
  • [44] Prefabricated Construction Process Optimization Based on Rework Risk
    Shen, Kaicheng
    Li, Xiaodong
    Cao, Xinying
    Zhang, Zhihui
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (06)
  • [45] Interactive client centric design management process for construction projects
    Alhava, O.
    Laine, E.
    Kiviniemi, A.
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION 2014, 2015, : 593 - 599
  • [46] Reduce rework, improve safety: an empirical inquiry into the precursors to error in construction
    Love, Peter E. D.
    Teo, Pauline
    Ackermann, Fran
    Smith, Jim
    Alexander, James
    Palaneeswaran, Ekambaram
    Morrison, John
    PRODUCTION PLANNING & CONTROL, 2018, 29 (05) : 353 - 366
  • [47] Design in Modular Construction
    Quale, John
    JOURNAL OF ARCHITECTURAL EDUCATION, 2017, 71 (01) : 119 - 120
  • [48] MODULAR DESIGN AND CONSTRUCTION
    TAN, MA
    KUMAR, RP
    KUILANOFF, G
    CHEMICAL ENGINEERING, 1984, 91 (11) : 90 - 96
  • [49] Design in modular construction
    Nash, Steve
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2015, 168 (04) : 154 - 154
  • [50] Exploring the adoption of blockchain in modular integrated construction projects: A game theory-based analysis
    Zhang, Pan
    Wu, Haitao
    Li, Heng
    Zhong, Botao
    Fung, Ivan W. H.
    Lee, Yiu Yin Raymond
    JOURNAL OF CLEANER PRODUCTION, 2023, 408