Integrated Design Process for Modular Construction Projects to Reduce Rework

被引:21
|
作者
Hyun, Hosang [1 ]
Kim, Hyunsoo [2 ]
Lee, Hyun-Soo [3 ]
Park, Moonseo [3 ]
Lee, Jeonghoon [4 ]
机构
[1] Seoul Natl Univ, Inst Engn Res, Gwanak Ro 1, Seoul 08826, South Korea
[2] Dankook Univ, Dept Architectural Engn, 152 Jukjeon Ro, Yongin 16890, Gyeonggi Do, South Korea
[3] Seoul Natl Univ, Dept Architecture & Architectural Engn, Gwanak Ro 1, Seoul 08826, South Korea
[4] Construct Engn Policy Inst Korea, Tech Policy Res Team, Eonju Ro 650, Seoul 06098, South Korea
关键词
modular construction; rework; integrated design process; dependency structure matrix (DSM); process optimization; ON-SITE; CONSTRAINTS; SELECTION; DEFECTS; SYSTEM;
D O I
10.3390/su12020530
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In modular construction projects, unit production and onsite work are conducted concurrently, enabling shorter duration, lower cost, and improved quality. Because of the nature of the work, building design details should be determined early in the design phase, which requires information from participants. However, the design process for stick-built construction does not include such information, which leads to errors in design, such as omissions and conflicts of information from participants, causing reworking in the design phase. To reduce errors, an information flow should be identified representing when/what/how the information should be shared, and with whom. This paper proposes an integrated design process based on the information flow. To identify the flow, a precedence relationship between activities is represented using a dependency structure matrix (DSM). Then, the order of activities is rearranged using a partitioning algorithm. In this manner, unnecessary feedback and reverse information flow, which are related to errors, are reduced. Finally, the rearranged activities are proposed as an integrated design process. To validate the impact of the proposed process and methodology, interviews with experts were conducted. The validation results suggest that the project delivery method should also be considered in the early project phase in practical application.
引用
收藏
页数:19
相关论文
共 50 条
  • [21] Integrated and modular design of an optimized process architecture
    Rassfeld, C.
    Roessle, D.
    Jochem, R.
    INTERNATIONAL JOURNAL OF PRODUCTION MANAGEMENT AND ENGINEERING, 2013, 1 (01) : 63 - 75
  • [22] Integrated Design Optimization Process for Building Projects
    Aslay, Semi Emrah
    Dede, Tayfun
    Kaveh, Ali
    PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2024, 68 (04): : 1175 - 1183
  • [23] CAD-integrated parametric modular construction design
    Teschemacher, Tobias
    Bletzinger, Kai-Uwe
    ENGINEERING REPORTS, 2023, 5 (08)
  • [24] Visualization of building interior design to reduce rework
    Li, H
    Love, PED
    1998 IEEE CONFERENCE ON INFORMATION VISUALIZATION - PROCEEDINGS, 1998, : 187 - 191
  • [25] Occupational Health and Safety in Modular Integrated Construction projects: The case of crane operations
    Mohandes, Saeed Reza
    Abdelmageed, Sherif
    Hem, Sakda
    Yoo, Joo Sang
    Abhayajeewa, Tharindu
    Zayed, Tarek
    JOURNAL OF CLEANER PRODUCTION, 2022, 342
  • [26] Quantitative evaluation and ranking of the critical success factors for modular integrated construction projects
    Wuni, Ibrahim Yahaya
    Shen, Geoffrey Qiping
    Osei-Kyei, Robert
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (11) : 2108 - 2120
  • [27] Forensic project management: The underlying causes of rework in construction projects
    Love, P
    Edwards, D
    CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2004, 21 (03) : 207 - 228
  • [28] Construction Small-Projects Rework Reduction for Capital Facilities
    Zhang, Di
    Haas, Carl T.
    Goodrum, Paul M.
    Caldas, Carlos H.
    Granger, Robin
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2012, 138 (12): : 1377 - 1385
  • [29] Determining the probability distribution of rework costs in construction and engineering projects
    Love, Peter E. D.
    Sing, Chun-Pong
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2013, 9 (11) : 1136 - 1148
  • [30] An integrated method of automated layout design and optimization for modular construction
    Zheng, Zihao
    Li, Yuanqi
    Torres, Jaume
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (03) : 1016 - 1036