Resource management of bridge deck rehabilitation: Jacques Cartier bridge case study

被引:12
|
作者
Zhang, Cheng [1 ]
Zayed, Tarek [1 ]
Hammad, Amin [2 ]
机构
[1] Concordia Univ, Dept Bldg Civil & Environm Engn, Montreal, PQ H3G 1M7, Canada
[2] Concordia Univ, Concordia Inst Informat Syst Engn, Montreal, PQ H3G 1M7, Canada
关键词
Bridge decks; Canada; Costs; Optimization; Rehabilitation; Resource management; Simulation;
D O I
10.1061/(ASCE)0733-9364(2008)134:5(311)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The condition and performance of bridges vary widely across North America. The large amount of expenditures on bridges needs significant efforts to optimize budget and resource allocation and to select the best rehabilitation or replacement method, which reduces project cost and duration. Simulation has been widely used in the construction area to optimize productivity and resource allocation. Current research optimizes resource combination for bridge deck rehabilitation projects using discrete event simulation. The Jacques Cartier Bridge redecking project is selected as a case study. Data related to productivity and duration of different activities were collected from the project. Probability distributions are fitted, which show the robustness of normal distribution to fit most variables. A simulation model is developed for this project in order to experiment with and perform sensitivity analysis. Based on the simulation results, an optimum resource combination of deck rehabilitation is obtained, which is [five teams, two saws, three old section trucks, and five new panel trucks] TSON 5235 with the unit (panel) cost of $747/h (direct cost only). The model developed is tested against real productivity where it shows reasonable results. The present research is relevant to both researchers and practitioners. It provides bridge redecking researchers with a real case study, a simulation model, and an approach to analyze projects. It also provides practitioners with an approach to optimize the usage of their resources considering direct project cost.
引用
收藏
页码:311 / 319
页数:9
相关论文
共 50 条
  • [31] Study on the Bridge Deck Pavement Strengthened by Planted Steel Bars of the Hollow Slab Bridge
    Zhao, Shaowei
    Gu, Jianchao
    [J]. ADVANCES IN STRUCTURAL ENGINEERING, PTS 1-3, 2011, 94-96 : 1252 - 1256
  • [32] Study on the Effect of Bridge Deck Spacing on Characteristics of Smoke Temperature Field in a Bridge Fire
    An, Weiguang
    Shi, Lei
    Wang, Hailei
    Zhang, Taike
    [J]. FIRE-SWITZERLAND, 2022, 5 (04):
  • [33] Integrated Management of Bridge Infrastructure through Bridge Digital Twins: A Preliminary Case Study
    Adibfar, Alireza
    Costin, Aaron M.
    [J]. COMPUTING IN CIVIL ENGINEERING 2021, 2022, : 358 - 365
  • [34] Integration of SHM into Bridge Management Systems: Case Study-Z24 Bridge
    Figueiredo, E.
    Radu, L.
    Park, G.
    Farrar, C.
    [J]. STRUCTURAL HEALTH MONITORING 2011: CONDITION-BASED MAINTENANCE AND INTELLIGENT STRUCTURES, VOL 1, 2011, : 725 - +
  • [35] Rehabilitation of Damaged High-Strength Bolted Joints and Bridge Deck Strengthening Techniques for Shengli Huanghe River Bridge
    Xu, Gangnian
    Wang, Laiyong
    Li, Wei
    Wang, Xigang
    [J]. Bridge Construction, 2023, 53 (06) : 151 - 158
  • [36] Study on Mechanical Behaviors of Orthotropic Deck of Highway Bridge
    Han, Bing
    Pu, Qianhui
    Xu, Leiping
    Yang, Shili
    Chen, Liangjun
    [J]. PROCEEDINGS OF THE 2016 6TH INTERNATIONAL CONFERENCE ON MACHINERY, MATERIALS, ENVIRONMENT, BIOTECHNOLOGY AND COMPUTER (MMEBC), 2016, 88 : 2033 - 2037
  • [37] An Experimental Study on the shear connection for UHPC Deck Bridge
    Yoo, Dong-Min
    Hwang, Hoon-Hee
    Kim, Sung-Tae
    Park, Sung-Yong
    [J]. COMPOSITES RESEARCH, 2011, 24 (05): : 29 - 33
  • [38] The Effect of Deck Width Addition Toward Stability of Cable Stayed Bridge: Case Study of Siak Sri Indrapura Bridge, Riau
    Supriyadi, Bambang
    Siswosukarto, Suprapto
    Masagala, Algazt A.
    Hadjoh, Imanuel Elvis S.
    [J]. INTERNATIONAL SYMPOSIUM ON CIVIL AND ENVIRONMENTAL ENGINEERING 2016 (ISCEE 2016), 2017, 103
  • [39] Investigation on materials for prefabricated bridge deck pavement and construction technology: Application to a case study of concrete box-girder bridge
    Liu, Yang
    Qian, Zhen-Dong
    Xie, Yu-Xin
    Xu, Shi-Qiao
    [J]. CASE STUDIES IN CONSTRUCTION MATERIALS, 2024, 20
  • [40] Rehabilitation of Tappan Zee Bridge using precast concrete composite deck units
    White, RN
    Smith, P
    [J]. FIFTH INTERNATIONAL BRIDGE ENGINEERING CONFERENCE, VOLS 1 AND 2: BRIDGES, OTHER STRUCTURES, AND HYDRAULICS AND HYDROLOGY, 2000, 1696 : 63 - 72