The performance of workload control concepts in job shops: Improving the release method

被引:117
|
作者
Land, MJ [1 ]
Gaalman, GJC [1 ]
机构
[1] Univ Groningen, Fac Management & Org, NL-9700 AV Groningen, Netherlands
关键词
job shop; workload control; order release;
D O I
10.1016/S0925-5273(98)00052-8
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A specific class of production control concepts for jobs shops is based on the principles of workload control. Practitioners emphasise the importance of workload control. However, order release methods that reduce the workload on the shop floor show poor due date performance in job shop simulations. This paper traces the reasons behind the poor results of release methods that subject the workload to norms. An alternative release approach is proposed which improves the due date performance significantly. Simulation results show that the method is able to maintain the control of workload without the use of rigid norms. (C) 1998 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:347 / 364
页数:18
相关论文
共 50 条
  • [41] IMPROVING THE JOB-SHOP WORKLOAD CONTROL THROUGH ORDER ACCEPTANCE AND DUE-DATE NEGOTIATION
    Alves Moreira, Maria do Rosario
    EUROPEAN SIMULATION AND MODELLING CONFERENCE 2009, 2009, : 141 - 145
  • [42] EFFECTIVE DISPATCH RULES TO IMPROVE PERFORMANCE IN JOB SHOPS.
    Wacker, John G.
    Lucht, Dale M.
    Production & Inventory Management, 1985, 26 (03): : 77 - 87
  • [43] Adaptive scheduling and tool flow control in flexible job shops
    Chen, Jie
    Chen, F. Frank
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (15) : 4035 - 4059
  • [44] An Agent-Based Scheduling Method for Flexible Job Shops
    Ren, Haiying
    Sun, Hongling
    INFORMATION SYSTEMS IN THE CHANGING ERA: THEORY AND PRACTICE, 2009, : 478 - 484
  • [45] JOB RELEASE UNDER DUE DATE CONSTRAINTS IN JOB SHOPS WITH TIME-VARYING PRODUCT MIX
    Zhang, Tao
    Rose, Oliver
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 2216 - 2226
  • [46] An investigation of order release and flow time allowance policies for assembly job shops
    Bertrand, JWM
    Van de Wakker, AM
    PRODUCTION PLANNING & CONTROL, 2002, 13 (07) : 639 - 648
  • [47] Workload resampling for performance evaluation of parallel job schedulers
    Zakay, Netanel
    Feitelson, Dror G.
    CONCURRENCY AND COMPUTATION-PRACTICE & EXPERIENCE, 2014, 26 (12): : 2079 - 2105
  • [48] Workload, Workaholism, and Job Performance: Uncovering Their Complex Relationship
    Spagnoli, Paola
    Haynes, Nicholas J.
    Kovalchuk, Liliya Scafuri
    Clark, Malissa A.
    Buono, Carmela
    Balducci, Cristian
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2020, 17 (18) : 1 - 20
  • [50] A new input-output control order release mechanism: How workload control improves manufacturing operations in a job shop
    Moreira, MR
    Alves, R
    MODELLING AND SIMULATION 2005, 2005, : 101 - 107