JOB RELEASE UNDER DUE DATE CONSTRAINTS IN JOB SHOPS WITH TIME-VARYING PRODUCT MIX

被引:0
|
作者
Zhang, Tao [1 ]
Rose, Oliver [1 ]
机构
[1] Univ Bundeswehr Munchen, Dept Comp Sci, Werner Heisenberg Weg 39, D-85577 Neubiberg, Germany
关键词
ANT COLONY OPTIMIZATION; CONWIP SYSTEM;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Job shops produce products on the basis of manufacturing orders which specify the due date and the volume. The orders accepted by the shop floor are put into a job pool. The job release decides when to start each job in the pool. It attempts not only to balance this time-varying demand against available capacity, but also manages to meet the due date constraints. The general job release policies, such as output-based or workload-based policies, have poor due date performance. A multi-time-periods release policy is proposed to match the time-varying demand. The due date pressure is distributed to every period. In each time period a near optimal short-term throughput of each product is obtained by an optimization model. The optimization problem is solved by an improved ant colony algorithm. In iteration processes of the algorithm ants are evaluated by the simulation which involves the setup and breakdown of machines.
引用
收藏
页码:2216 / 2226
页数:11
相关论文
共 50 条
  • [1] New approaches to due date assignment in job shops
    Baykasoglu, Adil
    Gocken, Mustafa
    Unutmaz, Zeynep D.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (01) : 31 - 45
  • [2] A FRAMEWORK FOR THE STUDY OF DUE DATE MANAGEMENT IN JOB SHOPS
    RAGATZ, GL
    MABERT, VA
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (04) : 685 - 695
  • [3] A load-based and due-date-oriented approach to order review/release in job shops
    Sabuncuoglu, I
    Karapinar, HY
    DECISION SCIENCES, 2000, 31 (02) : 413 - 447
  • [4] DUE DATE ASSIGNMENT, JOB ORDER RELEASE, AND SEQUENCING INTERACTION IN JOB SHOP SCHEDULING
    AHMED, I
    FISHER, WW
    DECISION SCIENCES, 1992, 23 (03) : 633 - 647
  • [5] Time-varying job creation and macroeconomic shocks
    Guglielminetti, Elise
    Pouraghdam, Meradj
    LABOUR ECONOMICS, 2018, 50 : 156 - 179
  • [6] MINIMIZING THE NUMBER OF TARDY JOB UNITS UNDER RELEASE TIME CONSTRAINTS
    HOCHBAUM, DS
    SHAMIR, R
    DISCRETE APPLIED MATHEMATICS, 1990, 28 (01) : 45 - 57
  • [7] Parallel Job Scheduling with Time-varying Constraints for Heterogeneous Multiple-Cluster Systems
    Zhang, Weizhe
    Zhang, Hongli
    Liu, Xinran
    Gu, Xuemai
    PROCEEDINGS OF THE 9TH INTERNATIONAL CONFERENCE FOR YOUNG COMPUTER SCIENTISTS, VOLS 1-5, 2008, : 1843 - +
  • [8] Concurrent Scheduling of a Job Shop and Microgrid to Minimize Energy Costs Under Due Date Constraints
    Thornton, Ashley
    Schultz, Cedric
    Kara, Sami
    Reinhart, Gunther
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 1326 - 1330
  • [9] A PROBABILISTIC COST-BASED DUE-DATE ASSIGNMENT MODEL FOR JOB SHOPS
    KAPLAN, AC
    UNAL, AT
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (12) : 2817 - 2834
  • [10] Computer simulation of due-date setting in multi-machine job shops
    Veral, EA
    COMPUTERS & INDUSTRIAL ENGINEERING, 2001, 41 (01) : 77 - 94