The PEP-II B-factory and the BABAR detector

被引:0
|
作者
Witherell, MS
机构
关键词
D O I
10.1007/BF02823647
中图分类号
O412 [相对论、场论]; O572.2 [粒子物理学];
学科分类号
摘要
I summarize the physics goals that motivate the construction of the PEP-II B-Factory and the BABAR detector and give a brief status report on the accelerator progress. I then describe the requirements for each of the detector systems and how the chosen design satisfies those requirements. Finally, I give projections for the physics performance.
引用
收藏
页码:1061 / 1074
页数:14
相关论文
共 50 条
  • [31] Status of PEP-II and BABAR
    Lista, L
    NUCLEAR PHYSICS B-PROCEEDINGS SUPPLEMENTS, 1998, 66 : 541 - 544
  • [32] Overall HOM measurement at high beam currents in the PEP-II SLAC B-factory
    Novokhatski, A.
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 692 - 694
  • [33] Stretchforming vacuum chambers for the PEP-II B-factory high energy storage ring
    Daly, EF
    Bostic, D
    Lisin, A
    Palrang, M
    Perkins, C
    Skarpaas, K
    PROCEEDINGS OF THE 1995 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 1996, : 2057 - 2059
  • [34] Modeling of the sparks in Q2-bellows of the PEP-II SLAC B-factory
    Novokhatski, A.
    Seeman, J.
    Sullivan, M.
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 520 - 522
  • [35] New Q2-bellows absorber for the PEP-II SLAC B-factory
    Novokhatski, A.
    DeBarger, S.
    Ecklund, S.
    Kurita, N.
    Seeman, J.
    Sullivan, M.
    Weathersby, S.
    Wienands, U.
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 523 - 525
  • [36] Mechanical design of the HER synchrotron light monitor primary mirror for the PEP-II B-Factory
    Daly, EF
    Fisher, AS
    Kurita, NR
    Langton, JB
    PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS, 1998, : 2014 - 2016
  • [37] Diagnostics development for the PEP-II B factory
    Fisher, AS
    Alzofon, D
    Arnett, D
    Bong, E
    Daly, E
    Gioumousis, A
    Kulikov, A
    Kurita, N
    Langton, J
    Reuter, E
    Seeman, JT
    Wienands, HU
    Wright, D
    Chin, M
    Hinkson, J
    Hunt, D
    Kennedy, K
    BEAM INSTRUMENTATION - PROCEEDINGS OF THE SEVENTH WORKSHOP, 1997, (390): : 248 - 256
  • [38] Results from a prototype permanent magnet dipole-quadrupole hybrid for the PEP-II B-factory
    Sullivan, M.
    Bowden, G.
    Ecklund, S.
    Jensen, D.
    Nordby, M.
    Ringwall, A.
    Wolf, Z.
    Proceedings of the IEEE Particle Accelerator Conference, 1998, 3 : 3330 - 3332
  • [39] Results from a prototype permanent magnet dipole-quadrupole hybrid for the PEP-II B-factory
    Sullivan, M
    Bowden, G
    Ecklund, S
    Jensen, D
    Norby, M
    Ringwall, A
    Wolf, Z
    PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS, 1998, : 3330 - 3332
  • [40] Some solved problems with the SLAC PEP-II B-Factory Beam-Position Monitor system
    Johnson, RG
    Smith, SR
    BEAM INSTRUMENTATION WORKSHOP 2000, 2000, 546 : 448 - 455