The PEP-II B-factory and the BABAR detector

被引:0
|
作者
Witherell, MS
机构
关键词
D O I
10.1007/BF02823647
中图分类号
O412 [相对论、场论]; O572.2 [粒子物理学];
学科分类号
摘要
I summarize the physics goals that motivate the construction of the PEP-II B-Factory and the BABAR detector and give a brief status report on the accelerator progress. I then describe the requirements for each of the detector systems and how the chosen design satisfies those requirements. Finally, I give projections for the physics performance.
引用
收藏
页码:1061 / 1074
页数:14
相关论文
共 50 条
  • [21] RF SYSTEM RESEARCH-AND-DEVELOPMENT FOR THE PEP-II B-FACTORY
    RIMMER, RA
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION B-BEAM INTERACTIONS WITH MATERIALS AND ATOMS, 1995, 99 (1-4): : 717 - 720
  • [22] Low energy ring lattice of the PEP-II asymmetric B-factory
    Cai, Y
    Donald, M
    Helm, R
    Irwin, J
    Nosochkov, Y
    Ritson, DM
    Yan, Y
    Forest, E
    Zholents, A
    PROCEEDINGS OF THE 1995 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 1996, : 576 - 578
  • [23] PEP-II B-factory prototype higher order mode load design
    Pendleton, R
    Ko, K
    Ng, C
    Neubauer, M
    Schwarz, H
    PROCEEDINGS OF THE 1995 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 1996, : 1800 - 1802
  • [24] HOM heating at the PEP-II B-Factory IR beryllium vacuum pipe
    Lin, X
    Ng, CK
    Ko, K
    PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS, 1998, : 387 - 389
  • [25] HOM heating at the PEP-II B-Factory IR beryllium vacuum pipe
    Lin, X.
    Ng, C.-K.
    Ko, K.
    Proceedings of the IEEE Particle Accelerator Conference, 1998, 1 : 387 - 389
  • [26] Numerical modeling of beam-environment interactions in the PEP-II B-factory
    Ng, CK
    Ko, K
    Li, Z
    Lin, XE
    COMPUTATIONAL ACCELERATOR PHYSICS, 1997, (391): : 9 - 14
  • [27] Lattice design for the high energy ring of the SLAC B-factory (PEP-II)
    Donald, MHR
    Cai, Y
    Irwin, J
    Nosochkov, Y
    PROCEEDINGS OF THE 1995 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 1996, : 591 - 593
  • [28] Design and analysis of a wiggler magnet system for the PEP-II B-Factory LER
    Heim, J
    Kendall, M
    Bertolini, L
    Fackler, O
    OConnor, T
    Swan, T
    Zholents, A
    IEEE TRANSACTIONS ON MAGNETICS, 1996, 32 (04) : 2625 - 2628
  • [29] Damping higher order modes in the PEP-II B-factory vertex bellows
    Weathersby, S
    Langton, J
    Novokhatski, A
    Seeman, J
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 3420 - 3422
  • [30] Status of PEP-II and BaBar
    Dorfan, J
    INTERNATIONAL JOURNAL OF MODERN PHYSICS A, 2000, 15 : 22 - 34